Vancouver, British Columbia--(Newsfile Corp. - April 1, 2024) - First Majestic Silver Corp. (NYSE: AG) (TSX: FR) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce the 2023 Mineral Reserve and Mineral Resource estimates for its four material mineral properties with an effective date of December 31, 2023. Three material properties are currently in production: the San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine, and the La Encantada Silver Mine. The fourth material property, the Jerritt Canyon Gold Mine, is currently in temporary suspension in respect of mining activities, with the Company currently focused on exploration, definition, and expansion of the mineral resources, and the optimization of mine planning and plant operations.

During 2023, the Company completed a total of 143,454 metres of exploration drilling. Approximately 85% of this drilling was focused on near-mine or brownfield targets while the remainder was focused on greenfield targets exploring for new discoveries. In 2023, the Company's Measured and Indicated and Inferred Mineral Resource estimates remained relatively unchanged in contained silver equivalent ("AgEq") ounces; exploration at Santa Elena successfully offset Reserve depletion following record annual production of 9.6 million AgEq ounces..

2023 HIGHLIGHTS (compared to prior Mineral Reserve and Mineral Resource estimates on December 31, 2022)

  • Proven and Probable ("P&P") Mineral Reserve estimates at the Company's three producing material assets totalled 122.5 million AgEq ounces consisting of 56.1 million ounces of silver and 671,000 ounces of gold, which represents a 2% decrease in tonnes, a 9% decrease in silver ounces and a 14% decrease in gold ounces.

  • Measured and Indicated ("M&I") Mineral Resource estimates (inclusive of Mineral Reserves) for the four material assets totalled 346.6 million AgEq ounces consisting of 95.9 million ounces of silver and 2.9 million ounces of gold, which represents a 1% increase in tonnes, a 6% decrease in silver ounces and a 3% increase in gold ounces, respectively. The changes to Mineral Resource estimates reflect mining depletion and updated cut-off grades from new economic parameters including costs, metal recoveries and metal prices. Exploration drilling results added new Mineral Resources and identified additional mineralized areas. Jerritt Canyon added 207,000 ounces of gold to its M&I Mineral Resource estimates.

  • Inferred Mineral Resource estimates for the Company's four material assets totalled 283.8 million AgEq ounces consisting of 65 million ounces of silver and 2.6 million ounces of gold, which represents a 6% increase in tonnes, a 12% decrease in silver ounces and a 10% increase in gold ounces. Jerritt Canyon added 360,000 ounces of gold to its Inferred Mineral Resource driven by a combination of expansionary drilling results, modelling of additional mineralized areas and a decreased cut-off grade.

2023 PRODUCTION TABLE

  Units SAN
DIMAS
SANTA
ELENA
LA
ENCANTADA
JERRITT
CANYON
TOTAL
Ore Processed Tonnes 875,345 882,592 966,392 177,643 2,901,972
Material from Reserves Mined and Processed Tonnes 764,444 882,592 152,259 -- 1,799,295
Material Mined from Areas Not in Reserves Tonnes 110,900 -- 814,134 177,643 1,102,677
Silver Produced Ounces 6,355,308 1,176,591 2,718,856 -- 10,250,755
Gold Produced Ounces 76,964 100,535 321 21,101 198,921
Silver-Equivalent Produced from Gold Ounces 6,434,612 8,395,201 26,766 1,767,083 16,623,662
Silver-Equivalent Produced Ounces 12,789,920 9,571,792 2,745,622 1,767,083 26,874,417
  1. Silver‐equivalent ounces are estimated considering metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine. Details as to the method of calculation can be found in the applicable tables in each mine section of the Company's Annual Information Form dated April 1, 2024 (the "AIF").

Metal price assumptions used to estimate the December 31, 2023 Mineral Reserves were $22.50/oz for silver and $1,850/oz for gold. This compares to the previous metal price assumptions of $21.50/oz for silver and $1,750/oz for gold used to calculate the Company's 2022 Mineral Reserve estimates.

Metal price assumptions used to estimate the December 31, 2023 Mineral Resources were $24.50/oz for silver and $2,000/oz for gold. This compares to the previous metal price assumptions of $23.00/oz for silver and $1,900/oz for gold used to calculate the Company's 2022 Mineral Resources estimates.

MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

As of December 31, 2023, P&P Mineral Reserve estimates at the Company's three producing material assets totalled 56.2 million ounces of silver and 671,000 ounces of gold, which represents a total of 122.5 million AgEq ounces.

Santa Elena's P&P Mineral Reserve estimates remained relatively unchanged despite record production of 9.6 million AgEq ounces from Ermitaño. At La Encantada, P&P Mineral Reserves estimates increased mainly due to mine design updates in the Milagros ore body. At San Dimas, P&P Mineral Reserve estimates decreased due to a combination of depletion, cost driven increase of cut-off grade and the exclusion of low tonnage pillars.

Proven and Probable Mineral Reserve Estimates with an Effective Date of December 31, 2023

Mine   Mineral Tonnage Grades Metal Content
  Category Type k tonnes Ag (g/t) Au (g/t) Ag-Eq (g/t) Ag (k Oz) Au (k Oz) Ag-Eq (k Oz)
SAN DIMAS                  
  Proven (UG) Sulphides 1,972 265 3.47 556 16,780 220 35,270
  Probable (UG) Sulphides 1,663 254 2.69 480 13,580 144 25,640
  Total Proven and Probable (UG) Sulphides 3,635 260 3.11 521 30,360 364 60,910
SANTA ELENA                  
  Proven (UG - Ermitano) Sulphides 590 78 3.87 548 1,473 73 10,386
  Proven (UG - Santa Elena) Sulphides 164 140 1.54 267 735 8 1,408
  Probable (UG - Ermitano) Sulphides 2,086 65 2.87 414 4,367 193 27,774
  Probable (UG - Santa Elena) Sulphides 679 167 1.30 275 3,636 28 5,996
  Probable (Pad) Oxides 325 25 0.39 65 266 4 677
  Total Proven and Probable (UG+Pad) Oxides + Sulphides 3,843 85 2.48 374 10,478 307 46,241
LA ENCANTADA                  
  Probable (UG) Oxides 3,675 130 - 130 15,321 - 15,321
  Total Probable (UG) Oxides 3,675 130 - 130 15,321 - 15,321
Consolidated FMS                  
  Proven (UG) All mineral types 2,726 217 3.44 537 18,988 302 47,064
  Probable (UG) All mineral types 8,428 137 1.36 278 37,171 369 75,409
  Total Proven and Probable All mineral types 11,153 157 1.87 342 56,159 671 122,472
  1. Mineral Reserves have been classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into NI 43-101.
  2. The Mineral Reserve statement provided in the table above has an effective date of December 31, 2023, except for the Santa Elena Leach Pad estimate, which has an effective date of March 11, 2024.
  3. The Mineral Reserve estimates were prepared under the supervision of, or were reviewed by, Brian Boutilier, P.Eng., Internal QP for First Majestic, who is a Qualified Person under NI 43-101.
  4. The Mineral Reserves were estimated from the M&I portions of the Mineral Resource estimates. Inferred Mineral Resources were not considered to be converted into Mineral Reserve estimates.
  5. AgEq is estimated considering metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the selling contract.
    • (a) The AgEq grade formula used was:
    • AgEq Grade = Ag Grade + Au Grade * (Au Recovery * Au Payable * Au Price) / (Ag Recovery * Ag Payable * Ag Price).
    • (b) Metal prices considered for Mineral Reserve estimates were $22.5/oz Ag and $1,850/oz Au for all sites.
    • (c) Other key assumptions and parameters include: metallurgical recoveries; metal payable terms; direct mining costs, processing costs, indirect and G&A costs and sustaining costs. These parameters are different for each mine and mining method assumed and are presented in each mine section of the AIF.

  6. A two-step constraining approach has been implemented to estimate Mineral Reserves for each mining method in use: A General Cut-Off Grade ("GC") was used to delimit new mining areas that will require development of access, infrastructure and all sustaining costs. A second Incremental Cut-Off Grade ("IC") was considered to include adjacent mineralized material which recoverable value pays for all associated costs, including but not limited to the variable cost of mining and processing, indirect costs, treatment, administration costs and plant sustaining costs but excludes the access development assumed to be covered by the block above the GC grade.
  7. The cut-off grades, metallurgical recoveries, payable terms and modifying factors used to convert Mineral Reserves from Mineral Resources are different for all mines and are presented in each mine section in the AIF.
  8. Modifying factors for conversion of resources to reserves include consideration for planned dilution which is based on spatial and geotechnical aspects of the designed stopes and economic zones, additional dilution consideration due to unplanned events, materials handling and other operating aspects, and mining recovery factors. Mineable shapes were used as geometric constraints.
  9. Tonnage is expressed in thousands of tonnes; metal content is expressed in thousands of ounces. Metal prices and costs are expressed in USD.
  10. Numbers have been rounded as required by reporting guidelines. Totals may not sum due to rounding.
  11. The technical reports from which the above-mentioned information is derived are cited under the heading "Technical Reports for Material Properties" in the AIF.

M&I Mineral Resource estimates for the four material assets totalled 346.6 million AgEq ounces consisting of 95.9 million ounces of silver and 2.9 million ounces of gold. The M&I tonnes increased by 1% compared to 2022. M&I Mineral Resources at Jerritt Canyon increased by 207,000 gold ounces primarily due to successful drilling programs at the SSX and Smith mines that expanded the mineralization, combined with an overall decrease in gold cut-off grade from assumptions related to increased gold prices and lower costs due to self-performed mining instead of third-party contractor mining. M&I Mineral Resource estimates are reported inclusive of Mineral Reserve estimates.

Inferred Mineral Resource estimates for the Company's four material properties totalled 283.8 million AgEq ounces consisting of 65 million ounces of silver and 2.6 million ounces of gold. Successful exploration drilling at Jerritt Canyon outlined new Inferred Resource estimates, additional mineralized areas were modeled, and a reduction of the gold cut-off grade all contributed to an increase in Inferred Resources totalling 360,000 ounces of gold.

Measured and Indicated Mineral Resource Estimates with an Effective Date of December 31, 2023

Mine / Project   Mineral Tonnage Grades Metal Content
  Category / Area Type k tonnes Ag (g/t) Au (g/t) Ag-Eq (g/t) Ag (k Oz) Au (k Oz) Ag-Eq (k Oz)
MATERIAL PROPERTIES                  
SAN DIMAS                  
  Measured (UG) Sulphides 2,124 449 5.92 942 30,640 404 64,340
  Indicated (UG) Sulphides 1,821 353 3.80 671 20,680 223 39,260
  Total Measured and Indicated (UG) Sulphides 3,945 405 4.94 817 51,320 627 103,600
SANTA ELENA                  
  Measured Ermitano (UG) Sulphides 612 81 4.38 613 1,600 86 12,060
  Measured Santa Elena (UG) Sulphides 387 152 1.72 295 1,890 21 3,670
  Indicated Ermitano (UG) Sulphides 2,306 71 3.45 489 5,260 256 36,280
  Indicated Santa Elena (UG) Sulphides 1,384 163 1.52 290 7,250 68 12,890
  Indicated (Leach Pad) Oxides Spent Ore 337 25 0.39 64 270 4 690
  Total Measured and Indicated (UG+Pad) All Mineral Types 5,026 101 2.69 406 16,280 435 65,590
JERRITT CANYON                  
  Measured (UG) Sulphides 5,717 - 5.25 429 - 966 78,850
  Indicated (UG) Sulphides 4,490 - 5.42 442 - 782 63,860
  Indicated (OP) Sulphides 711 - 3.43 280 - 78 6,400
  Total Measured and Indicated (UG and OP) All Mineral Types 10,918 - 5.20 425 - 1,827 149,110
LA ENCANTADA                  
  Indicated (UG) Oxides 3,299 178 - 178 18,900 - 18,900
  Indicated Tailings Deposit No. 4 Oxides 2,458 119 - 119 9,410 - 9,410
  Total Indicated (UG+Tailings) All Mineral Types 5,756 153 - 153 28,310 - 28,310
TOTAL MATERIAL PROPERTIES                  
  Total Measured (UG) All Mineral Types 8,840 120 5.20 559 34,130 1,478 158,920
  Total Indicated(UG and OP) All Mineral Types 16,806 114 2.61 347 61,770 1,411 187,690
  Total Measured and Indicated (UG and OP) All Mineral Types 25,646 116 3.50 420 95,900 2,888 346,610
  1. Mineral Resource estimates have been classified in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into NI 43-101.
  2. The Mineral Resource estimates provided above have an effective date of December 31, 2023, except for the Santa Elena Leach Pad estimate, which has an effective date of March 11, 2024.
  3. The Mineral Resource estimates were prepared by the Company's Internal QPs, who have the appropriate relevant qualifications, and experience in geology and resource estimation. The Mineral Resource estimates were prepared under the supervision of, or were reviewed by, David Rowe, CPG, Internal QP for First Majestic, who is a Qualified Person under NI 43-101.
  4. Sample data was collected through a cut-off date of December 31, 2023 for the material properties except for the Santa Elena Leach Pad estimate, which has an effective date of March 11, 2024. All properties account for relevant technical information and mining depletion through December 31, 2023.
  5. Metal prices considered for Mineral Resource estimates were $24.5/oz Ag and $2,000/oz Au.
  6. Silver-equivalent grade is estimated considering: metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine. Estimation details are listed in each mine section of the AIF.
  7. The cut-off grades and cut-off values used to report Mineral Resources are different for all mines. The cut-off grades, values and economic parameters are listed in the applicable section describing each mine section in the AIF.
  8. M&I Mineral Resource estimates are inclusive of the Mineral Reserve estimates.
  9. Tonnage is expressed in thousands of tonnes; metal content is expressed in thousands of ounces. Totals may not add up due to rounding.
  10. The technical reports from which the above-mentioned information for the material properties is derived are cited under the heading "Technical Reports for Material Properties" in the AIF.

Inferred Mineral Resource Estimates with an Effective Date of December 31, 2023

Mine / Project   Mineral Tonnage Grades Metal Content
  Category / Area Type k tonnes Ag (g/t) Au (g/t) Ag-Eq (g/t) Ag (k Oz) Au (k Oz) Ag-Eq (k Oz)
MATERIAL PROPERTIES                  
SAN DIMAS                  
  Inferred Total (UG) Sulphides 3,959 306 3.67 612 38,990 467 77,940
  Inferred Total (UG) Sulphides 3,959 306 3.67 612 38,990 467 77,940
SANTA ELENA                  
  Inferred Ermitaño (UG) Sulphides 2,049 65 2.34 349 4,280 154 22,970
  Inferred Santa Elena (UG) Sulphides 1,340 143 1.55 272 6,160 67 11,700
  Inferred (Leach Pad) Oxides Spent Ore 50 35 0.66 101 60 1 160
  Inferred Total (UG + Pad) All Mineral Types 3,439 95 2.01 315 10,500 222 34,840
JERRITT CANYON                  
  Inferred Total (UG) Sulphides 11,565 - 4.89 399 - 1,819 148,490
  Inferred Total (OP) Sulphides 862 - 3.10 253 - 86 7,010
  Inferred Total (UG & OP) Sulphides 12,427 - 4.77 389 - 1,905 155,500
LA ENCANTADA                  
  Inferred Total (UG) Oxides 2,115 204 - 204 13,890 - 13,890
  Inferred Tailings Deposit No. 4 Oxides 427 118 - 118 1,620 - 1,620
  Inferred Total (UG + Tailings) All Mineral Types 2,542 190 - 190 15,510 - 15,510
  Total Inferred Material Properties All Mineral Types 22,367 90 3.61 395 65,000 2,594 283,790
  1. Mineral Resource estimates have been classified in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into NI 43-101.
  2. The Mineral Resource estimates provided above have an effective date of December 31, 2023, except for the Santa Elena Leach pad estimate, which has an effective date of March 11, 2024. The Mineral Resource estimates were prepared by the Company's Internal QPs, who have the appropriate relevant qualifications, and experience in geology and resource estimation.
  3. The Mineral Resource estimates were prepared under the supervision of, or were reviewed by, David Rowe, CPG, Internal QP for First Majestic, who is a Qualified Person under NI 43-101.
  4. Sample data was collected through a cut-off date of December 31, 2023 for the material properties, except for the Santa Elena Leach pad estimate, which has an effective date of March 11, 2024. All properties account for relevant technical information and mining depletion through December 31, 2023.
  5. Metal prices considered for Mineral Resource estimates were $24.5/oz Ag and $2,000/oz Au.
  6. Silver-equivalent grade is estimated considering metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine. Estimation details are listed in each mine section of the AIF.
  7. The cut-off grades and cut-off values used to report Mineral Resource estimates are different for all mines. The cut-off grades, values and economic parameters are listed in the applicable section describing each mine section in the AIF.
  8. Tonnage is expressed in thousands of tonnes; metal content is expressed in thousands of ounces. Totals may not add up due to rounding.
  9. The technical reports from which the above-mentioned information for the material properties is derived are cited under the heading "Technical Reports for Material Properties" in the AIF.

The Company also announces that it has filed its Annual Information Form for the year ended December 31, 2023 (the "AIF") under its profile on SEDAR+ at www.sedarplus.ca. In addition, the Company has filed its Annual Report on Form 40-F for the year ended December 31, 2023 with the United States Securities and Exchange Commission. The Form 40-F, which includes the Company's annual audited financials statements, management's discussion and analysis ("MD&A") and AIF, is available on EDGAR at www.sec.gov/edgar, and on the Company's website at www.firstmajestic.com

Shareholders may also receive a copy of First Majestic's Annual Report which includes the annual audited financial statements and MD&A, free of charge, upon request to First Majestic, Suite 1800 - 925 West Georgia Street, Vancouver, B.C., Canada, V6C 3L2, or by e-mail to info@firstmajestic.com.

QUALIFIED PERSONS

Scientific and technical disclosure in this news release relating to the Company's material properties is based on technical reports for the material properties that have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") (collectively, the "Technical Reports"). The Technical Reports have been filed under the Company's profile on SEDAR+ at www.sedarplus.ca. The technical information has been updated with more current information where appropriate.

Gonzalo Mercado, P.Geo., the Company's Vice President of Exploration and Technical Services and a "Qualified Person" as defined under NI 43-101, has reviewed and approved the scientific and technical information contained in this news release. Mineral Resource estimates were prepared under the supervision of, or were reviewed by, David Rowe, CPG, our Director of Mineral Resources. Mineral Reserve estimates were prepared under the supervision of, or were reviewed by, Brian Boutilier, P.Eng., our Principal Mine Planning Engineer. Each of Mr. Rowe and Mr. Boutilier are also "Qualified Persons" under NI 43-101.

ABOUT THE COMPANY

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates the San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine, and the La Encantada Silver Mine as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold project located in northeastern Nevada, U.S.A.

First Majestic is proud to offer a portion of its silver production for sale to the public. Bars, ingots, coins and medallions are available for purchase online at www.firstmint.com, at some of the lowest premiums available.

FOR FURTHER INFORMATION, contact info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll-free number: 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward-Looking Statements

This press release contains "forward‐looking information" and "forward‐looking statements" under applicable Canadian and U.S. securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends, current conditions and expected future developments. Forward‐looking statements in this press release include, but are not limited to, statements with respect to: the expansion of Mineral Resources. Assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, guidance cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon guidance and forward‐looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking statements. Statements concerning proven and probable mineral reserves and mineral resource estimates may also be deemed to constitute forward‐looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the case of measured and indicated mineral resources or proven and probable mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements".

Actual results may vary from forward‐looking statements. Forward‐looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward‐looking statements, including but not limited to: the duration and effects of the coronavirus and COVID‐19, and any other pandemics on our operations and workforce, and the effects on global economies and society; general economic conditions including inflation risks; actual results of exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment or processes relative to specifications and expectations; accidents; labour relations; relations with local communities; changes in national or local governments; changes in applicable legislation or application thereof; delays in obtaining approvals or financing or in the completion of development or construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; outcomes of pending litigation; limitations on insurance coverage as well as those factors discussed in the section entitled "Description of the Business ‐ Risk Factors" in the Company's most recent AIF, available on SEDAR+ at www.sedarplus.ca, and Form 40‐F available on EDGAR at www.sec.gov/edgar. Although First Majestic has attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.

The Company believes that the expectations reflected in these forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/203834

December 10, 2024
First Majestic Announces Mailing of Materials for Special Meeting
December 3, 2024
First Majestic Announces Effectiveness of Registration Statement on Form F-4 and Record & Meeting Dates of Special Meeting for Gatos Silver Acquisition
November 7, 2024
First Majestic Announces Financial Results for Q3 2024 and Quarterly Dividend Payment
October 17, 2024
First Majestic Produces 5.5 Million AgEq Oz in Q3 2024 Consisting of 2.0 Million Silver Ounces and 41,761 Gold Ounces
September 10, 2024
First Majestic Announces Share Repurchase Program
September 5, 2024
First Majestic Announces Agreement to Acquire Gatos Silver
August 1, 2024
First Majestic Announces Financial Results for Q2 2024, Increased Silver Inventory, and Quarterly Dividend Payment
July 30, 2024
First Majestic Announces New High-Grade Gold and Silver Discovery at Santa Elena
July 18, 2024
First Majestic Produces 5.3 Million AgEq Oz in Q2 2024 Consisting of 2.1 Million Silver Ounces and 39,339 Gold Ounces; Announces Updated 2024 Production and Cost Guidance and Conference Call Details
June 13, 2024
First Majestic Reports Positive Exploration Results at San Dimas
May 30, 2024
First Majestic Releases 2023 Annual Report
May 28, 2024
First Majestic Releases 2023 Sustainability Report and Strategy
May 24, 2024
First Majestic Announces Ticker Symbol Change on the Toronto Stock Exchange to "AG"
May 24, 2024
First Majestic Announces Voting Results from Annual General Meeting
May 14, 2024
First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 8, 2024
First Majestic Announces Financial Results for Q1 2024 and Quarterly Dividend Payment
April 16, 2024
First Majestic Produces 5.2 Million AgEq Oz in Q1 2024
April 1, 2024
First Majestic Announces 2023 Mineral Reserve and Mineral Resource Estimates
March 26, 2024
First Majestic Announces Commencement of Bullion Sales from First Mint
February 22, 2024
First Majestic Announces Financial Results for Q4 2023, FY2023, Quarterly Dividend Payment and Deferral of Silver Sales
February 7, 2024
First Majestic Reports Positive Exploration Results at San Dimas, Santa Elena and Jerritt Canyon Properties
January 16, 2024
First Majestic Produces 6.6 Million AgEq Oz in Q4 2023 and 26.9 Million AgEq Oz in 2023; Announces 2024 Production and Cost Guidance and Announces Conference Call Details.
November 2, 2023
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2023
First Majestic Produces 6.3 Million AgEq Oz in Q3 2023 Consisting of 2.5 Million Silver Ounces and 46,720 Gold Ounces
September 14, 2023
First Majestic Announces the Opening of a Minting Facility
August 14, 2023
First Majestic Announces Closing Sale of La Parrilla
August 3, 2023
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2023
First Majestic Produces 6.3 million AgEq Oz in Q2 2023 Consisting of 2.6 million Silver Ounces and 45,022 Gold Ounces; Announces Updated 2023 Guidance and Management Update
July 18, 2023
First Majestic Reports High-Grade Exploration Results at San Dimas, Santa Elena and Jerritt Canyon
May 26, 2023
First Majestic Announces Voting Results from Annual General Meeting
May 22, 2023
CORRECTION FROM SOURCE: First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 22, 2023
First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 4, 2023
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 20, 2023
First Majestic Produces 7.6 million AgEq Oz in Q1 Consisting of 2.5 million Silver Ounces and 60,594 Gold Ounces; Announces VP Management Changes
March 31, 2023
First Majestic Announces 2022 Mineral Reserve and Mineral Resource Estimates
March 30, 2023
First Majestic Announces Closing Sale of La Guitarra to Sierra Madre
March 20, 2023
First Majestic Temporarily Suspends Mining Activities at Jerritt Canyon
March 20, 2023
First Majestic Renews Share Repurchase Program
February 23, 2023
First Majestic Announces Financial Results for Q4 2022, FY2022 & Quarterly Dividend Payment
January 19, 2023
First Majestic Produces 7.6M AgEq Oz in Q4 2022 and a Record 31.3M AgEq Oz in 2022; Annual Retail Silver Bullion Sales Increase 27% to New Record; Announces 2023 Production and Cost Guidance and Conference Call Details
December 21, 2022
First Majestic Announces Closing Sale of Royalty Portfolio to Metalla
December 7, 2022
First Majestic Announces Proposed Sale of The La Parrilla Silver Mine for Up To US$33.5 Million
November 28, 2022
First Majestic Announces the Proposed Sale of Its Royalty Portfolio for US$20.0 Million
November 9, 2022
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
November 1, 2022
First Majestic Reports Continued Exploration Success Intersecting 19.97 g/t Au over 20.9m Near Active Underground Mining at Jerritt Canyon
October 18, 2022
First Majestic Produces a New Record of 8.8 Million AgEq Ounces in the Third Quarter Consisting of 2.7 Million Silver Ounces and 67,072 Gold Ounces
August 23, 2022
First Majestic Intersects 19.35 g/t Au over 23.2m in Potential New High-Grade Gold Zone at Jerritt Canyon; Follow-up Drilling Confirms Presence of High-Grade Gold Pod near Active Underground Mining in Smith Mine
August 8, 2022
First Majestic Releases 2021 Sustainability Report
August 4, 2022
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2022
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
July 20, 2022
First Majestic Produces 7.7M Silver Eqv. Oz in the Second Quarter Consisting of 2.8M Oz Silver and 59,391 Oz Gold; Announces Updated 2022 Guidance and Conference Call Details
May 31, 2022
First Majestic Intersects 8.39 g/t Au over 29.7m near Active Underground Mining at Jerritt Canyon
May 27, 2022
First Majestic Announces Voting Results from Annual General & Special Meeting
May 25, 2022
First Majestic Announces Proposed Sale of the La Guitarra Silver Mine
May 12, 2022
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 18, 2022
First Majestic Produces 7.2M Silver Eqv. Oz in the First Quarter Consisting of 2.6M Oz Silver and 58,892 Oz Gold
March 31, 2022
First Majestic Announces 2021 Mineral Reserve and Resource Estimates
March 17, 2022
First Majestic Renews Share Repurchase Program
March 10, 2022
First Majestic Announces Financial Results for Q4 2021, FY2021 & Quarterly Dividend Payment; Appoints New CFO
January 18, 2022
First Majestic Produces New Quarterly Record of 8.6M Silver Eqv. Oz in Q4 2021 and Achieves FY2021 Guidance with New Annual Production Record of 26.9M Silver Eqv. Oz; Announces 2022 Guidance and Today's Conference Call Details; Appoints Interim CFO
December 2, 2021
First Majestic Completes US$230 Million Convertible Senior Notes Offering
November 30, 2021
First Majestic Prices Offering of Convertible Senior Notes
November 29, 2021
First Majestic Launches Offering of Convertible Senior Notes
November 24, 2021
First Majestic Files Updated Technical Report for the Santa Elena Silver/Gold Mine in Sonora, Mexico Including a Positive Pre-Feasibility Study for the Ermitaño Project; Appoints Vice-President of Exploration
November 4, 2021
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2021
First Majestic Produces a Record 7.3m Silver Eqv. Oz in the Third Quarter Consisting of 3.3m Oz Silver and 54,525 Oz Gold; Suspended Silver Sales and Held 1.4m Oz of Silver in Inventory at Quarter End
August 16, 2021
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 13, 2021
First Majestic Produces 3.3M Oz Silver and 46,545 Oz Gold (6.4M Silver Eqv. Oz) in the Second Quarter of 2021 - Announces Updated 2021 Guidance, New Board Appointment and Conference Call Details
May 28, 2021
First Majestic Announces Voting Results from Annual General Meeting and Management Update
May 6, 2021
First Majestic Reports First Quarter Financial Results, Inaugural Dividend Payment, and Appointment of VP Operations
April 30, 2021
First Majestic Completes Acquisition of Jerritt Canyon Mine in Nevada, USA and Private Placement with Eric Sprott
April 14, 2021
First Majestic Produces 2.9M Oz Silver and 23,873 Oz Gold (4.5M Silver Eqv. Oz) in the First Quarter of 2021
March 31, 2021
First Majestic Files Updated Technical Reports, 2020 Mineral Reserve and Mineral Resource Estimates & Appoints New Director
March 30, 2021
First Majestic Updates ESG Sustainability Activities Aimed at Helping Local Communities and Improving the Environment
March 18, 2021
First Majestic Renews Share Repurchase Program
March 12, 2021
First Majestic Announces Acquisition of Jerritt Canyon Mine in Nevada, USA
March 10, 2021
First Majestic Responds to Inaccurate Media Reports and Provides Update on Tax Dispute with the Government of Mexico
March 5, 2021
First Majestic Awarded as Socially Responsible Business in Mexico
March 2, 2021
First Majestic Initiates International Arbitration Request under NAFTA against the Government of Mexico
February 18, 2021
First Majestic Announces Financial Results for Q4 2020, FY2020 and Appointment of New Director
January 28, 2021
First Majestic Responds to Market Activity
January 20, 2021
First Majestic Produces 5.5M Silver Eqv. Oz in Q4 2020 (3.5M Silver Oz and 26K Gold Oz); Provides 2021 Outlook and Conference Call Details
December 7, 2020
First Majestic Announces Inaugural Dividend Policy
November 12, 2020
First Majestic to Appeal Circuit Court Decision to Nullify APA
November 5, 2020
First Majestic Reports Third Quarter Financial Results – Generates Record Revenues, Cash Flows and Earnings
October 13, 2020
First Majestic Produces 3.2M Oz Silver and 25,771 Oz Gold (5.2M Silver Eqv. Oz) in the Third Quarter
September 25, 2020
First Majestic Provides SAT Tax Dispute Update
September 21, 2020
First Majestic Announces Filing of Early Warning Report for Acquisition of Shares of Silver Dollar Resources Inc.
September 17, 2020
First Majestic Announces Closing of CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 10, 2020
First Majestic Announces CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 1, 2020
First Majestic Publishes ESG and Sustainability Report
August 6, 2020
First Majestic Reports Second Quarter Financial Results
July 15, 2020
First Majestic Produces 3.5 Million Silver Equivalent Ounces from Partial Operations in Second Quarter; Updates 2020 Guidance & Announces Conference Call Details
July 2, 2020
First Majestic Completes Acquisition of Springpole Silver Stream
June 11, 2020
First Majestic Acquires Silver Stream on First Mining’s Springpole Project
June 10, 2020
First Majestic Announces Voting Results from Annual General Meeting and Appointment of New Director
May 14, 2020
First Majestic Reports First Quarter Financial Results; Temporarily Postpones the Sale of Silver and Gold Due to COVID-19; Announces Operational Restart Procedures
May 13, 2020
First Majestic Initiates NAFTA Arbitration Process Against Mexico for Violating International Law
April 14, 2020
First Majestic Produces 6.2 Million Silver Equivalent Ounces in First Quarter
April 3, 2020
First Majestic Provides Update on Operations in Response to COVID-19
March 30, 2020
First Majestic Updates 2019 Mineral Reserve and Resource Estimates
March 27, 2020
First Majestic Acquires Shares in GR Silver - Early Warning
March 18, 2020
First Majestic Renews Share Repurchase Program
February 24, 2020
First Majestic Announces High-Grade Drill Results from its 2019 Exploration Program at the Ermitaño project within the Santa Elena land package
February 19, 2020
First Majestic Announces Financial Results for Q4 and Year End 2019
February 3, 2020
First Majestic Announces New Chief Operating Officer
January 21, 2020
First Majestic Announces 2020 Production and Cost Guidance
January 15, 2020
First Majestic Produces 6.2M Ounces in Q4 and Record 25.6M Ounces in 2019; Announces New Director & Conference Call Details
November 7, 2019
First Majestic Reports Third Quarter Financial Results
October 15, 2019
First Majestic Produces 6.6 Million Silver Equivalent Ounces in Third Quarter
August 7, 2019
First Majestic Reports Second Quarter Financial Results and Updates 2019 Production and Cost Guidance
July 15, 2019
First Majestic Produces 6.4 Million Silver Equivalent Ounces in Second Quarter; Provides Conference Call Details
May 24, 2019
First Majestic Announces Voting Results from Annual General Meeting and Management Changes
May 9, 2019
First Majestic Reports First Quarter Financial Results
May 1, 2019
First Majestic First Quarter Financial Results to be Released on May 9
April 16, 2019
First Majestic Produces 6.3 Million Silver Equivalent Ounces in First Quarter
March 29, 2019
First Majestic Updates 2018 Mineral Reserve and Resource Estimates
March 19, 2019
First Majestic Renews Share Repurchase Program
February 25, 2019
First Majestic Announces High-Grade Drill Results from 2018 Exploration Program at the Ermitaño Silver/Gold Project; Permitting Status Update
February 25, 2019
First Majestic Announces Financial Results for Q4 and Year End 2018
January 14, 2019
First Majestic Produces a Record 22.2M Silver Eqv. Oz in 2018; Announces Higher 2019 Production Outlook & Conference Call Details
December 27, 2018
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
November 7, 2018
First Majestic Reports Third Quarter Financial Results
November 6, 2018
First Majestic Announces Updated Release Date for Third Quarter Financial Results
October 15, 2018
First Majestic Files Preliminary Base Shelf Prospectus
October 15, 2018
First Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter
September 10, 2018
First Majestic and Evrim Resources Agree to Exercise of Ermitaño and Cumobabi Option Agreements
August 13, 2018
First Majestic Reports Second Quarter Financial Results
July 16, 2018
First Majestic Produces a Record 5.1M Silver Equivalent Ounces in Second Quarter; Increases 2018 Production Guidance to 20.5M - 22.6M Silver Equivalent Ounces
May 25, 2018
First Majestic Announces Voting Results from Annual General Meeting
May 10, 2018
First Majestic Announces New Stream Agreement at San Dimas Mine and New Credit Facility
May 10, 2018
First Majestic Completes Acquisition of Primero
May 9, 2018
First Majestic Announces Amendments to Advance Notice Policy
May 9, 2018
First Majestic Reports First Quarter Financial Results
May 9, 2018
Primero Announces Receipt of Mexican Antitrust Clearance for Arrangement With First Majestic and Files First Quarter Financial Statements on SEDAR
April 19, 2018
First Majestic Produces 3.9M Silver Eqv. Oz in First Quarter
March 29, 2018
First Majestic Updates Mineral Reserve and Resource Estimates for 2017 and Files Form 40-F Annual Report
March 19, 2018
First Majestic Renews Share Repurchase Program
March 13, 2018
Primero Announces Shareholders Vote In Favour Of Transaction With First Majestic
February 28, 2018
First Majestic Announces Financial Results for Q4 and Year End 2017
February 15, 2018
First Majestic announces Exercise and Closing of Over-Allotment Option
January 29, 2018
First Majestic Completes US$150 Million Convertible Senior Notes Offering
January 25, 2018
First Majestic Prices Offering of Convertible Senior Notes
January 24, 2018
First Majestic Launches Offering of Convertible Senior Notes
January 16, 2018
First Majestic Produces 16.2M Silver Eqv. Oz in 2017 (4.1M Silver Eqv. Oz in Q4); Announces 2018 Production Outlook and Cost Guidance
January 12, 2018
First Majestic Silver Announces Friendly Acquisition of Primero Mining and Restructured Stream with Wheaton Precious Metals
January 9, 2018
First Majestic Provides Review of 2017 Exploration Program and Plans for 2018
December 20, 2017
First Majestic files updated NI 43-101 technical reports on its Del Toro, La Parrilla and San Martin Silver Mines
November 2, 2017
First Majestic Reports Third Quarter Financial Results
October 17, 2017
First Majestic Produces 4.0M Silver Eqv. Oz in Third Quarter
October 3, 2017
First Majestic Reports Accident at La Encantada
August 3, 2017
First Majestic Reports Second Quarter Financial Results
July 11, 2017
First Majestic Produces 3.9M Silver Eqv. Oz in Second Quarter
June 2, 2017
First Majestic to Resume Operations at La Encantada
May 26, 2017
First Majestic Announces Voting Results from Annual General Meeting
May 24, 2017
First Majestic Announce illegal Blockade at La Encantada
May 4, 2017
First Majestic Reports First Quarter Financial Results
April 20, 2017
First Majestic Produces 4.3M Silver Eqv. Oz in First Quarter
March 31, 2017
First Majestic Updates Mineral Reserve and Resource Estimates for YE2016 and Files Form 40-F Annual Report
March 16, 2017
First Majestic Renews Share Repurchase Program
February 28, 2017
First Majestic Appoints New COO and New Member to Board of Directors
February 22, 2017
First Majestic Announces Financial Results for Q4 and Year End 2016
January 17, 2017
First Majestic Produces a Record 18.7M Silver Eqv. Oz in 2016 (4.4M Silver Eqv. Oz in Q4); Announces 2017 Production Outlook and Cost Guidance
November 9, 2016
First Majestic Reports Third Quarter Financial Results
October 27, 2016
Third Quarter Financial Results to be Released on November 9
October 13, 2016
First Majestic Achieves New Record in Silver Production; Produces 4.5 Million Silver Eqv. Ounces in Third Quarter
September 15, 2016
First Majestic Announces Resignation of Ramon Davila From Board of Directors
August 10, 2016
First Majestic Reports Second Quarter Financial Results
July 25, 2016
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 10
July 12, 2016
First Majestic Produces 4.7 Million Silver Eqv. Ounces in Second Quarter
May 27, 2016
First Majestic Announces Election of Directors
May 16, 2016
First Majestic Silver Corp. Changes Annual General Meeting Time
May 12, 2016
First Majestic Silver Corp. Announces Closing of C$50 Million Bought Deal Financing; Over-Allotment Option Fully Exercised
May 10, 2016
First Majestic Reports First Quarter Financial Results
May 5, 2016
First Majestic Revises Date of First Quarter Financial Results to May 10
April 25, 2016
First Majestic Silver Corp.: First Quarter Financial Results to be Released on May 11
April 22, 2016
First Majestic Silver Corp. Announces C$50 Million Bought Deal Financing
April 14, 2016
First Majestic Produces a Record 5.1 Million Silver Eqv. Ounces in First Quarter
March 31, 2016
First Majestic Updates Mineral Reserve and Resource Estimates for Year End 2015 and Files Form 40-F Annual Report
March 28, 2016
First Majestic Silver Corp. Announces Updated La Encantada NI 43-101 Technical Report
March 14, 2016
First Majestic Renews Share Repurchase Program
February 25, 2016
First Majestic Announces Financial Results for Q4 and Year End 2015
February 11, 2016
Fourth Quarter and Year End Financial Results to Be Released on February 25, 2016
February 11, 2016
First Majestic Secures $60 Million Credit Facility
January 19, 2016
First Majestic Produces 16.1M Silver Eqv. Oz in 2015 (4.8M Silver Eqv. Oz in Q4); Announces 2016 Production Outlook and Cost Guidance
November 16, 2015
First Majestic Reports Third Quarter Financial Results
October 14, 2015
First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3'15
October 1, 2015
First Majestic Completes Acquisition of SilverCrest
September 25, 2015
First Majestic and Silvercrest Announce Shareholder Approval of Plan of Arrangement
September 15, 2015
Leading Independent Advisory Firms ISS and Glass Lewis Recommend that SilverCrest and First Majestic Shareholders Vote FOR the Plan of Arrangement
August 27, 2015
First Majestic and SilverCrest Announce Receipt of Interim Order and Mailing of Meeting Materials
August 11, 2015
First Majestic Reports Second Quarter Financial Results and La Encantada Operational Update
July 30, 2015
First Majestic Silver: Second Quarter Financial Results to Be Released on August 11
July 27, 2015
First Majestic Announces Friendly Acquisition of SilverCrest Mines
July 9, 2015
First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15
May 22, 2015
First Majestic Announces Election of Directors
May 7, 2015
First Majestic Reports First Quarter Financial Results
April 23, 2015
First Quarter Financial Results to be Released on May 7
April 22, 2015
First Majestic Silver Corp. Announces Closing of C$30 Million Bought Deal Financing
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 6, 2015
First Majestic Announces Promotion of Martin Palacios to Chief Transformation Officer
April 6, 2015
First Majestic Announces Acquisition of Shares of First Mining Corp.
April 5, 2015
First Majestic Silver Corp. Announces C$30 Million Bought Deal Financing
March 31, 2015
Announces New La Guitarra NI 43-101 Technical Report
March 11, 2015
First Majestic Renews Share Repurchase Program
February 23, 2015
First Majestic Announces Financial Results for Q4 and Year End 2014
February 2, 2015
Fourth Quarter and Year End Financial Results to be Released on February 23, 2015
January 13, 2015
First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance
December 1, 2014
Supreme Court of Canada Dismisses Appeal Application by Hector Davila Santos
November 12, 2014
First Majestic Reports Third Quarter Financial Results
November 6, 2014
Conference Call Scheduled on November 12, 2014
October 31, 2014
Third Quarter Financial Results to be Released on November 12, 2014
October 14, 2014
Produces 3.5 Million Silver Eqv. Ounces in Q3; Postpones the Sale of 934K Silver Ounces of Inventory
August 22, 2014
First Majestic to List on the Mexican Stock Exchange
August 13, 2014
First Majestic Reports Second Quarter Financial Results
July 21, 2014
Second Quarter Financial Results to be Released on August 13, 2014
July 14, 2014
New Record of 3.86 million Silver Eqv. Ounces Produced in Q2; Announces Spin-out of Non-Core Exploration Properties
June 9, 2014
First Majestic Wins Application to Dismiss Appeal
May 29, 2014
First Majestic Announces Election of Directors
May 13, 2014
First Majestic Reports First Quarter Financial Results
May 1, 2014
First Quarter Financial Results to be Released on May 13
April 15, 2014
First Majestic Announces US$30M Forward Sale Contract on Lead Production
April 8, 2014
First Majestic's Q1 Production Reaches New Record of 3.63 million Silver Equivalent Ounces
April 4, 2014
First Majestic Appoints VP of Technical Services
March 27, 2014
First Majestic Updates Reserves and Resource Estimates and Files Form 40-F Annual Report
March 10, 2014
First Majestic Announces Extension of Share Repurchase Program
March 3, 2014
First Majestic Announces Changes to Operations and Geological Teams
February 26, 2014
First Majestic Announces Financial Results for Q4 and Year End 2013
February 3, 2014
Fourth Quarter and Year End Financial Results to be Released on February 26, 2014
January 14, 2014
First Majestic becomes a Senior Silver Producer; Produces 10.64M Ounces of Silver in 2013; Projects 12.70M to 13.35M Ounces of Silver in 2014
December 23, 2013
First Majestic Announces Retirement of Robert Young from Board of Directors
December 4, 2013
Silver Doré Production Commences at the Del Toro Silver Mine
November 12, 2013
First Majestic Reports Third Quarter Financial Results
October 30, 2013
Third Quarter Financial Results to be Released on November 12th
October 24, 2013
Appeal Against First Majestic Dismissed
October 16, 2013
First Majestic Produces a New Record of 3.37 million Silver Equivalent Ounces
September 30, 2013
First Majestic Applies to Dismiss Appeal of Positive Judgment for US$93.84 million
August 13, 2013
First Majestic Reports Second Quarter Financial Results
July 15, 2013
Second Quarter Financial Results to be Released on August 13th
July 10, 2013
First Majestic Produces a New Quarterly Record of 3.27 Million Silver Eqv. Ounces
July 2, 2013
Payment of CDN$14.85 million Received in Court Litigation
May 28, 2013
Updated San Martin NI 43-101 Technical Report and Economic Assessment
May 24, 2013
First Majestic Announces Election of Directors
May 15, 2013
First Majestic Reports First Quarter Earnings of $26.5 million on Revenues of $67.1 million
May 7, 2013
First Quarter Financial Results to be Released on May 15th
May 2, 2013
First Majestic Announces Completion of La Guitarra's Expansion to 500 tpd
April 26, 2013
First Majestic Receives Positive Judgment for US$89.6 in Court Litigation
April 17, 2013
First Majestic Earns Socially Responsible Business Distinction Award for Fifth Consecutive Year
April 15, 2013
First Majestic Produces Another Quarterly Record 2.73 Million Silver Eqv. Ounces
April 9, 2013
First Majestic Silver: Del Toro Silver Mine Flotation Circuit Deemed Commercial
March 28, 2013
First Majestic Files Form 40-F Annual Report
March 11, 2013
First Majestic Announces Share Repurchase Program
February 26, 2013
First Majestic Announces Financial Results for Q4 and Year End 2012
February 20, 2013
First Majestic Silver to Announce Fourth Quarter and Year End 2012 Financial Results
February 19, 2013
First Majestic Elects Not to Exercise Right to Match Coeur's Offer for Orko
February 14, 2013
First Majestic Considering Superior Offer from Coeur to Acquire Orko Silver
January 25, 2013
First Majestic Silver Corp.: Production Commences at the Del Toro Silver Mine
January 9, 2013
First Majestic Silver Corp.: Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M Silver Ounces) in Q4; Produced a Record 9.1M Silver Eqv. Ounces (8.3M Silver Ounces) in 2012
January 2, 2013
First Majestic Appoints VP of Operations
December 19, 2012
First Majestic Announces US$50M Forward Sale Contract on Base Metals
December 16, 2012
First Majestic Announces Friendly Acquisition of Orko Silver
November 14, 2012
First Majestic Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increase of 4%
November 7, 2012
First Majestic Silver Corp.: Third Quarter Financial Results to Be Released on November 14th
October 10, 2012
First Majestic Produces a Record 2.44 Million Silver Equivalent Ounces in Third Quarter
August 27, 2012
First Majestic Announces Appointment of VP of Exploration
August 21, 2012
First Majestic Silver Corp.: Updated Del Toro NI 43-101 Technical Report & Final Permit Received
August 16, 2012
First Majestic Recognized as a Leader in Corporate Social Responsibility
August 14, 2012
First Majestic Reports Second Quarter Financial Results
August 7, 2012
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 14th
July 17, 2012
First Majestic Produces 2.1 Million Silver Equivalent Ounces in Second Quarter
July 3, 2012
First Majestic Completes Acquisition of Silvermex Resources
June 26, 2012
Silvermex Securityholders Approve Plan of Arrangement With First Majestic
May 22, 2012
First Majestic Silver Corp.: Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
May 10, 2012
First Majestic Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compared With Q1 2011; Revenues Top $57.8M, Up 5% From Q1 2011
April 16, 2012
First Majestic Silver Corp.: First Quarter Production Results and Full Commencement of Commercial Production at La Parrilla
April 3, 2012
First Majestic Announces Friendly Acquisition of Silvermex Resources
March 30, 2012
First Majestic Files Form 40-F Annual Report
March 5, 2012
First Majestic Announces New Record Earnings & Cash Flows for 2011
February 24, 2012
First Majestic Silver to Announce Fourth Quarter and Year End 2011 Financial Results
January 24, 2012
First Majestic Silver Corp.-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro Construction Update
January 12, 2012
First Majestic Silver Corp. Achieved Record Production of 1.96M Silver Ounces (2.1M Silver Eqv. Ounces) in Q4; Produced a Record 7.6M Silver Eqv. Ounces in 2011
January 4, 2012
First Majestic Appoints Chief Information Officer
December 30, 2011
First Majestic Names Douglas Penrose as Chairman
November 9, 2011
First Majestic Silver Corp.: Earnings Hit $27.8 Million in Third Quarter
October 26, 2011
First Majestic Silver Corp.: Third Quarter Financial Results to be Released on November 9th
October 12, 2011
First Majestic Announces Q3 Production Results and Commences Commercial Production at La Parrilla
October 7, 2011
First Majestic Silver Corp.: Third Quarter Production Results to Be Released on October 12, 2011-Conference Call Scheduled
September 20, 2011
First Majestic Silver Corp.: First Stage of Expansion at the La Parrilla Processing Plant Completed
September 13, 2011
First Majestic Silver Corp.: Mill Capacity at La Parrilla to Reach 2,000 tpd Following Positive NI 43-101 Pre-Feasibility Study
August 11, 2011
First Majestic Silver Corp.: Record Earnings of $30.6 million in Second Quarter
August 3, 2011
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 11th
July 7, 2011
First Majestic Silver Corp.: Another Record Quarter of Silver Production
May 16, 2011
First Majestic Earns a Record $23.9 Million in First Quarter of 2011
April 7, 2011
First Majestic Silver Corp.: Silver Production Up 25%; Reaches 97% Pure Silver and Maintains Status as "Purest Silver Company in the World"
March 31, 2011
First Majestic Files Form 40-F Annual Report
March 31, 2011
First Majestic Silver Corp.: Update on the Del Toro Silver Mine
February 28, 2011
First Majestic Silver Corp.: 2010 Audited Financial Results Show Record Earnings & Cash Flows; A Breakout Year for First Majestic
January 11, 2011
First Majestic Silver Corp.: Production Up 72% to 6.53 Million oz Ag in 2010; Exceeds Guidance by 9%
December 13, 2010
First Majestic to List on the New York Stock Exchange
December 6, 2010
First Majestic Silver Corp.: La Parrilla Expansion to 1,600 Tonnes Per Day
November 10, 2010
First Majestic Acquires Surface Rights, Royalties and Infrastructure at Real De Catorce Silver Project
November 9, 2010
First Majestic Silver Corp.: Another Record Quarter of Earnings and Cash Flows
October 6, 2010
First Majestic Silver Corp.: Another New Record for Silver Production; 1,823,370 oz Silver Produced in Q3
August 16, 2010
First Majestic Silver Corp.: Record Earnings and Cash Flows. Purest Silver Producer With 93% of Revenue From Silver Production
July 8, 2010
First Majestic Silver Corp.: New Record for Silver Production; Produces 1,538,798 oz Silver
May 13, 2010
First Majestic Silver Corp.: First Quarter Marks 5th Consecutive Quarter of Net Income
April 22, 2010
First Majestic Silver Corp.: 2nd Year Running for Mexican Distinction as a "Socially Responsible Business"
April 13, 2010
First Majestic Silver Corp.: Conference Call to discuss First Quarter Silver Production and Year End Financial Results
April 12, 2010
First Majestic Silver Corp.: Production Increases by 30% to 1,619,403 Equivalent Ounces Silver
April 8, 2010
First Majestic Silver Corp.: La Encantada Achieves Commercial Production
March 24, 2010
First Majestic Silver Corp.: Conference Call to Discuss First Quarter Silver Production and Year End Financial Results
March 22, 2010
First Majestic Silver Corp.: Year End & Fourth Quarter Financial Results
January 11, 2010
First Majestic Silver Corp.: Production Increases by 18%, Reaches New Record
November 26, 2009
First Majestic Silver Corp.: La Encantada Opening Ceremony & Production of First Silver Precipitates
November 13, 2009
First Majestic Completes Acquisition of Normabec Mining Resources; Normabec Spins Out Brionor Resources Inc.
November 12, 2009
First Majestic Silver Corp.: Record Third Quarter Financial Results
November 6, 2009
Normabec Shareholders Approve Plan Of Arrangement With First Majestic
October 13, 2009
First Majestic Silver Corp.: La Encantada Expansion Nearing Completion
October 6, 2009
First Majestic Silver Corp.: Third Quarter Production Results
September 18, 2009
First Majestic Silver Corp.: Settlement of Current Liabilities Closes
September 16, 2009
First Majestic Silver Corp.: Second Tranche of Non-Brokered Private Placement Closes
September 14, 2009
First Majestic to Acquire Normabec Mining Resources
August 20, 2009
First Majestic Silver Corp.: First Tranche of Non-Brokered Private Placement Closes
August 13, 2009
First Majestic Silver Joins OTCQX
August 12, 2009
First Majestic Silver Corp.: Non-Brokered Private Placement and Debt Settlement
July 20, 2009
Second Quarter Production Results
July 16, 2009
Update of Litigation
May 14, 2009
First Majestic Silver Corp.: First Quarter Financial Results
April 27, 2009
First Majestic Silver Corp.: Silver Production Increases 4% in 1st Quarter
March 31, 2009
2008 Year End Financial Results
March 23, 2009
First Majestic Receives Mexican Distinction as a "Socially Responsible Business"
March 17, 2009
First Majestic Silver Corp.: La Parrilla Receives "Clean Industry Certification"
March 5, 2009
First Majestic Silver Corp.: Closing of $21.2 Million Offering
February 26, 2009
First Majestic Silver Corp.: Resource Disclosure Clarification
February 19, 2009
First Majestic Announces Pricing of Offering
February 18, 2009
First Majestic Announces C$25 Million Offering
February 17, 2009
First Majestic Silver Corp.: La Parrilla Silver Mine Updates NI 43-101 Resource
January 20, 2009
First Majestic Silver Corp.: San Martin Updated NI 43-101 Report Increasing Reserves/Resources by 45.81%
January 13, 2009
First Majestic Silver Corp.: Production Increases 27% in 4th Quarter
December 23, 2008
First Majestic Silver Corp.: La Encantada Updated NI 43-101 Report Increasing Reserves By 183%
November 19, 2008
First Majestic Silver Corp.: Operations Update
November 14, 2008
First Majestic Silver Corp.: Third Quarter Financial Results
October 28, 2008
First Majestic Silver Corp.: Another Major Intersection at Del Toro Silver Mine, Drill Hole Cuts 62.05 Metres (203.58 ft) of 422 g/t Ag, 6.29% Pb, 6.78% Zn & 0.74 g/t Au
October 23, 2008
First Majestic Silver Corp.: 3rd Quarter Production Results
October 10, 2008
First Majestic Silver Corp.: Del Toro Silver Mine NI 43-101 Resources of 57 Million Ag eqv. Ounces
September 11, 2008
First Majestic Silver Corp.: Many Positive Developments Underway
August 15, 2008
First Majestic Silver Corp.: Second Quarter Financial Results
July 17, 2008
First Majestic Silver Corp.: Major Intersection at San Juan Silver Mine; Drill Hole Intersects 74.20 Metres (243 ft) of 359 g/t Ag, 7.07% Pb & 7.60% Zn
July 15, 2008
First Majestic Silver Corp.: 2nd Quarter Production Shows Continued Ramp-Up
June 10, 2008
First Majestic Silver Corp.: Major Expansion Launched at La Encantada Silver Mine
May 16, 2008
First Majestic Silver Corp.: Record First Quarter Financial Results
April 29, 2008
First Majestic Silver Corp.: 1st Quarter Production Results
April 22, 2008
First Majestic Silver Corp.: Commissioning of Flotation Circuit at the San Martin Silver Mine
April 17, 2008
First Majestic Silver Corp.: 2007 Year End Financial Results
April 4, 2008
First Majestic Silver Corp.: Exercise and Closing of Over-Allotment Option
April 1, 2008
First Majestic Silver Corp.: Discovery of New High Grade Ore Shoot on the Vacas Vein at the La Parrilla Silver Mine
March 25, 2008
First Majestic Silver Corp.: Closing of $45,475,000 Offering
March 5, 2008
First Majestic Silver Corp.: Drill Intersects 39.6 Metres of 199 g/t Ag, 3.92% Pb & 4.02% Zn at San Juan Silver Mine
January 30, 2008
La Parrilla Silver Mine Update and New NI 43-101 Resource
January 17, 2008
Another Record Quarter of Silver Production
January 14, 2008
Toronto Stock Exchange Listing
December 13, 2007
TSX Conditional Approval
December 3, 2007
Update on the Chalchihuites Group of Properties
November 29, 2007
Highlights from 3rd Quarter Financial Statements
November 13, 2007
Update on the Cuitaboca Silver Project
October 23, 2007
Another Record Quarter of Silver Production
August 30, 2007
Highlights from 2nd Quarter Financial Statements
July 26, 2007
Second Quarter Silver Production Increases
July 4, 2007
La Parrilla Silver Mine Update and New NI 43-101 Resource
June 18, 2007
La Encantada Silver Mine Update and new NI 43-101 Resource
May 31, 2007
Highlights from 1st Quarter Financial Statements
May 28, 2007
San Martin Silver Mine Update and new NI 43-101 Resource
May 10, 2007
Closing of $34,415,000 Private Placement
April 28, 2007
Silver Production increases by 38%
April 20, 2007
Financing Amended
March 28, 2007
First Majestic Files Preliminary Short Form Prospectus

Subscribe