FIRST MAJESTIC SILVER CORP. (AG: NYSE; FR: TSX) (the “Company” or “First Majestic”) is pleased to announce the consolidated financial results for the Company’s fourth quarter and year ended December 31, 2013. The full version of the financial statements and the management discussion and analysis can be viewed on the Company’s web site at www.firstmajestic.com, on SEDAR at www.sedar.com and EDGAR at www.sec.gov.

HIGHLIGHTS
  • Silver equivalent production of 3.4 million ounces in Q4 2013, representing a 33% increase from Q4 2012; Full-year silver equivalent production of 12.8 million ounces, representing a 40% increase compared to 2012.
  • Silver production of 2.7 million ounces in Q4 2013, representing a 19% increase from Q4 2012; Full-year silver production of 10.6 million ounces, representing a 29% increase compared to 2012.
  • Achieved “Senior Silver Producer” status by exceeding the production threshold of 10 million ounces of pure silver.
  • Revenues after smelting and refining costs amounted to $59.0 million in Q4 2013; Full-year revenues were $251.3 million representing a 2% increase compared to 2012 despite a 26% decline in average realized silver price.
  • Adjusted net earnings (non-GAAP) normalized for non-cash or unusual items was $6.3 million or $0.05 per share in Q4 2013; Full-year adjusted net earnings was $65.1 million or $0.56 per share in 2013.
  • Reported net loss of $81.2 million in Q4 2013 after a non-cash impairment charge of $28.8 million and a deferred tax accounting adjustment of $38.8 million as a result of the recently enacted Mexican Tax Reforms.
  • Cash flow of $0.17 per share (non-GAAP) in Q4 2013; Full-year cash flow per share of $1.17 in 2013.
  • Total cash cost of $9.66 per payable silver ounce in Q4 2013; Full-year cash cost of $9.35 per payable silver ounce.
  • Successfully completed three separate expansion projects in 2013 ensuring future production growth plans remain intact.
“Last year was a big wake-up call to all mining companies due to the extreme price volatility throughout the metals market. However, I’m proud to say First Majestic’s team took quick action to reduce capital costs and delivered one of its best performances over the Company’s 10-year history,” said Keith Neumeyer, President and CEO of First Majestic. “Having successfully commissioned the new Del Toro operation in 2013, which became our fifth producing silver mine in Mexico, First Majestic delivered record annual production and achieved the milestone of producing over 10 million ounces of pure silver in a single year all while maintaining our low cost profile.”

“The Company continues to focus on operational efficiency, to optimize the mines to ensure profitability in a low price environment. These modifications are aimed to maintain First Majestic as one of the silver industry’s purest and highest margin producers.”

2013 ANNUAL AND FOURTH QUARTER HIGHLIGHTS


FINANCIAL RESULTS

The Company generated revenues of $59.0 million in the fourth quarter of 2013, a decrease of $12.0 million or 17% compared to $71.0 million in the fourth quarter of 2012. Revenues during the full-year 2013 were $251.3 million, an increase of $4.1 million compared to $247.2 million in 2012, as record production in 2013 resulted in 41% increase in payable equivalent silver ounces sold. However, the increase in ounces sold was offset by a 26% decrease in average realized silver price per ounce compared to 2012.

Due to the current metal price environment, the Company decided to take non-cash impairment charges totalling $28.8 million consisting of $24.6 million impairment of goodwill and $4.2 million of impairment charges on the exploration properties acquired from Silvermex Resources Inc.

Net loss after taxes for the fourth quarter and year ended December 31, 2013 were $81.2 million and $38.2 million respectively, compared to net earnings after taxes of $22.4 million and $88.9 million in the comparative periods of 2012. Net loss in the current period was attributed to the non-cash impairment charges and a non-cash accounting adjustment of $38.8 million to deferred income tax liabilities as a result of the recently enacted Mexican Tax Reforms. For the purpose of the impairment charge, the Company used a long-term silver price of $22.30 per ounce and discount rates ranging from 9% to 11%, equivalent to the Company’s weighted average cost of capital, adjusted for specific project risks.

Mine operating earnings were $14.3 million in the fourth quarter of 2013 compared to $39.5 million in the fourth quarter of 2012. The Company recognized mine operating earnings of $92.3 million in 2013, a decrease of 35% compared to $142.0 million in 2012. The decrease in mine operating earnings was primarily attributed to the decline in average realized silver price per ounce during the year. Depletion, depreciation and amortization expense increased by $17.9 million due to an 8% increase in tonnage milled and additional depreciation and amortization from the new Del Toro mine and full year of La Guitarra operations.

During 2013, the Company invested $178.7 million in the development and exploration of its mineral properties, construction of new processing plants and acquisitions of new mining equipment. As previously announced, the Company plans to invest a total of $106.0 million in 2014 on sustaining capital for current operations and expansionary capital for numerous growth projects. The 2014 annual budget implies an estimated 41% reduction in total capital expenditures following the completion of numerous capital intensive growth projects in 2013 including the investment of $122.5 million at Del Toro on the construction of the dual-circuit mill, acquisition of mining equipment and underground mine development, $8.1 million invested at San Martin to increase the plant’s capacity to 1,300 tonnes per day (” tpd”) and $4.3 million invested at La Guitarra to increase the plant’s capacity to 500 tpd.

OPERATIONAL RESULTS

On January 14, 2014, the Company announced its fourth quarter silver equivalent production increased to a record 3,421,161 ounces, an increase of 2% compared to 3,370,457 ounces in the previous quarter. Compared to the same quarter of the prior year, silver equivalent production increased by 33% primarily attributed to additional production from Del Toro, the successful plant expansion at La Guitarra and the improved head grades and tonnage milled at La Parrilla and San Martin.

The overall average head grade for the fourth quarter of 2013 was 191 grams per tonne (“g/t”), a 9% increase compared to 176 g/t in the fourth quarter of 2012 and a 5% decrease compared to 202 g/t in the third quarter of 2013. The increase from the same quarter of the prior year was primarily attributed to 24% increase in head grades from La Encantada due to a higher proportion of fresh ore being processed, 15% higher grades from San Martin, offset by 50% lower head grade from the La Guitarra mine as production ore came from areas within the La Guitarra vein which contained higher gold grades in conjunction with lower silver grades.

Consolidated cash costs per ounce in the fourth quarter were $9.66 compared to $8.84 in the third quarter of 2013 and $9.26 in the fourth quarter of 2012. The increase in cash cost per ounce compared to the prior quarter was primarily attributed to additional diesel and generator rental costs incurred at Del Toro due to delays in the construction of the new 115kV power line and higher than expected smelting and refining costs due to penalties for impurities as the mill was refining its metallurgical processes during the ramp up of this new mine. Additionally, lower recoveries and grades at San Martin resulted in higher cash costs during the fourth quarter. However, with steady production growth anticipated over the next few quarters coming from Del Toro’s cyanidation circuit ramp-up to 2,000 tpd and along with San Martin’s ramp- up to 1,300 tpd, cash costs per ounce are projected to decrease as additional ounces are produced.

Combined recoveries of silver for all mines in the fourth quarter were 64%, an increase of 9% compared to 58% in the fourth quarter of 2012, and remained relatively unchanged compared to 65% in the third quarter of 2013.

In the fourth quarter of 2013, a total of 8,324 metres were drilled over 89 holes consisting primarily of definition drilling and surface exploration drilling, representing a 6% increase from the 7,823 metres drilled in the third quarter of 2013 and 68% decrease from the 25,940 metres drilled in the fourth quarter of 2012. For the year ended 2013, a total of 58,578 metres were drilled compared to 135,769 metres drilled in 2012. As previously indicated, since the second quarter, the Company has been reducing its drilling program, with the majority of metres planned to be drilled by the Company’s own personnel and equipment for the support of mining production, as well as on preparing resource estimations for the future NI 43-101 Technical Reports. There are currently nine active drill rigs at the Company’s five operating mines, four of which are located at the La Encantada mine. The reduced drilling program is expected to delay the release of the planned NI 43-101 Technical Report updates to late 2014.

MINE OPERATIONS

Del Toro Silver Mine

Total production at Del Toro was 693,561 equivalent ounces of silver in the fourth quarter, which was an increase of 22% compared to 567,723 equivalent ounces in the third quarter of 2013. During the fourth quarter, the new cyanidation circuit had an average throughput of 904 tpd (based on 38 operating days) and the flotation circuit was operating at an average of 1,196 tpd (based on 74 operating days out of 92 calendar days) for a combined average operating rate of 2,100 tpd. The flotation circuit processed 88,468 tonnes during the fourth quarter with an average silver grade of 226 g/t and a 69% recovery of silver. The new cyanidation circuit processed a total of 34,370 tonnes with an average head grade of 164 g/t silver and recoveries of 60%. As the Company continues to ramp up the cyanidation to 2,000 tpd, it is expected that grades and recoveries will come closer to rates indicated in the Pre-feasibility Study (PFS) dated August 20, 2012.

Cash cost per ounce for the fourth quarter was $12.16, an increase of $2.87 compared to $9.29 in the previous quarter. The increase in cash cost per ounce is primarily attributed to additional diesel and generator rental costs due to delays in the construction of the power line, additional smelting and refining costs due to impurities and some inefficiencies related to early stage operations. Cash cost per ounce is expected to decline in mid-2014 as the power line is completed. In addition, the Company is working diligently to stabilize the milling and metallurgy process at Del Toro to assist in further reducing costs.

During late 2013, the Company entered into several option agreements to acquire six adjacent mineral properties, namely the Chalchihuites, Navidad, Milagros, Zaragosa, Santa Clara and Ivone properties. These properties consist of 492 hectares of mineral rights. When fully exercised, the total purchase price will amount to $3.3 million, of which $1.1 million has been paid, $0.6 million is due in 2014, $1.2 million in 2015 and the remaining balance of $0.4 million due over years 2016 and 2017.

La Encantada Silver Mine

A total of 962,505 equivalent ounces of silver were produced at the La Encantada plant during the fourth quarter of 2013. Production in the fourth quarter of 2013 increased 3% compared to the 931,027 equivalent ounces of silver produced in the third quarter of 2013 and decreased by 14% compared to the 1,117,254 equivalent ounces of silver produced in the fourth quarter of 2012.

Since the second quarter of 2013, the planned mix of fresh ore to old tailings being processed through the plant was altered by reducing the tailings feed by almost 50% while increasing the feed of fresh ore. During the fourth quarter of 2013, the ratio consisted of 72% fresh ore and 28% of old tailings with a total throughput averaging 3,042 tpd consisting of an average of 2,202 tpd of fresh mine ore and 840 tpd of old tailings. With the increase of fresh ore from the mine and the reduction of old tailings, the overall cost per tonne of production has increased due to the higher cost of mining from the underground mine compared to the low cost of hauling old tailings to the mill. Total production cost per tonne for La Encantada was $37.49 during the fourth quarter, consistent with the previous quarter, while cash cost per ounce in the current quarter was $10.61 and comparable to the $10.70 in the third quarter of 2013.

In 2014, the Company is planning to upgrade and expand the crushing and grinding areas to allow the underground extraction of fresh mine ore to be increased in the second half of 2014, including the installation of a new 24’ x 14’ ball mill. In addition, beginning in January 2014, the reprocessing of old tailings has been eliminated from the mill feed due to the low metal price environment. This modification is expected to improve both silver recoveries and the head grade at the mill.

La Parrilla Silver Mine

Total production at the La Parrilla mill was 1,151,728 equivalent ounces of silver in the fourth quarter of 2013, which was a decrease of 5% compared to 1,208,635 equivalent ounces in the third quarter of 2013 due to slight decrease in grade and recoveries of silver. Compared to the fourth quarter of 2012, total production increased 24% primarily due to 8% increase in tonnage processed. Cash costs per ounce in the fourth quarter were $6.45 and in-line with the previous quarter.

The Company has now completed 1,057 metres of development and construction of the underground rail haulage level. Due to the reduced budget in development costs, the timeline for the 5,000 metre project has been extended until the end of 2016. When completed, this new haulage and underground electric rail system will consist of 5,000 metres of development and a shaft of 260 vertical metres and will replace the current less efficient above-ground system of trucking ore to the mill. This investment is eventually expected to improve ore logistics, ultimately reducing overall operating costs and thereby delivering higher operating margins from La Parrilla’s complex of mines.

San Martin Silver Mine

Total production in the fourth quarter of 2013 was 313,834 ounces of silver equivalent, a decrease of 17% compared to the 377,816 ounces of silver equivalent produced in the third quarter of 2013, but 17% higher than the 267,635 equivalent ounces of silver produced in the fourth quarter of 2012. Production was negatively affected by some maintenance down time during the expansion into new equipment including the agitation tanks, impacting leaching time and impacting the counter current washing system, resulting in lower recoveries during the fourth quarter.

Cash costs per ounce in the fourth quarter was $13.96, an increase of 35% from compared to $10.34 in the third quarter. The increase in costs was due to a 17% decrease in produced silver ounces due to the lower recoveries experienced during the mechanical issues mentioned above and lower silver grades.

The average head grade was 156 g/t in the fourth quarter of 2013, compared to the 165 g/t in the third quarter of 2013 and 136 g/t in the fourth quarter of 2012. The decrease in the ore grade compared to third quarter of 2013 was due to lower grade in the stopes. The increase in ore grade compared to the same quarter of the prior year was attributed to production from the newly developed Rosarios/Huichola areas.

La Guitarra Silver Mine

During the quarter, total production at the La Guitarra mill was 299,533 equivalent ounces of silver, an increase of 5% compared to the 285,256 ounces produced in the third quarter of 2013 and an increase of 22% compared to the 246,319 ounces in the fourth quarter of 2012.

Cash cost in the fourth quarter was $4.08, which decreased by 28% compared to $5.63 in the third quarter. The decrease in cash costs was primarily attributed to an increase in gold by-product credits and reduction of smelting and refining costs.

The permitting of a 1,000 tpd cyanidation processing facility is currently in the planning and evaluation stage. It is anticipated that permit applications will be submitted to the Mexican authorities during 2014. Once this new processing facility is permitted and fully constructed, production of silver doré bars is anticipated to replace the production of silver/gold concentrates.

2014 GUIDANCE

On January 14, 2014, the Company announced 2014 silver production is expected to increase by 19% to 25% to a new operating range of 12.7 to 13.3 million silver ounces (or 14.8 to 15.6 million silver equivalent ounces). All-in sustaining costs are projected to be in the range of $15.87 to $16.69 per payable silver ounce.

The following is a summary of the Company’s 2014 outlook by producing mines:


CONFERENCE CALL AND WEBCAST

A conference call and webcast will be held today, February 26, 2014 at 11:00 a.m. PST (2:00 p.m. EST) to review and discuss the financial results. To participate in the conference call, please dial the following:

Toll Free Canada & USA: 1-800-319-4610
Outside of Canada & USA: 1-604-638-5340
Toll Free Germany: 0800 180 1954
Toll Free UK: 0808 101 2791

Participants should dial in 10 minutes prior to the conference.

Click on WEBCAST on the First Majestic homepage as a simultaneous audio webcast of the conference call will be posted at www.firstmajestic.com.

First Majestic is a mining company focused on silver production in México and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FOR FURTHER INFORMATION contact info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.
“signed”
Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release includes certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”, “may”, “schedule” and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses, permits and approvals from government authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company’s title to properties; and the factors identified under the caption “Risk Factors” in the Company’s Annual Information Form, under the caption “Risks Relating to First Majestic’s Business”.

Investors are cautioned against attributing undue certainty to forward-looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.
February 22, 2024
First Majestic Announces Financial Results for Q4 2023, FY2023, Quarterly Dividend Payment and Deferral of Silver Sales
February 7, 2024
First Majestic Reports Positive Exploration Results at San Dimas, Santa Elena and Jerritt Canyon Properties
January 16, 2024
First Majestic Produces 6.6 Million AgEq Oz in Q4 2023 and 26.9 Million AgEq Oz in 2023; Announces 2024 Production and Cost Guidance and Announces Conference Call Details.
November 2, 2023
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2023
First Majestic Produces 6.3 Million AgEq Oz in Q3 2023 Consisting of 2.5 Million Silver Ounces and 46,720 Gold Ounces
September 14, 2023
First Majestic Announces the Opening of a Minting Facility
August 14, 2023
First Majestic Announces Closing Sale of La Parrilla
August 3, 2023
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2023
First Majestic Produces 6.3 million AgEq Oz in Q2 2023 Consisting of 2.6 million Silver Ounces and 45,022 Gold Ounces; Announces Updated 2023 Guidance and Management Update
July 18, 2023
First Majestic Reports High-Grade Exploration Results at San Dimas, Santa Elena and Jerritt Canyon
May 26, 2023
First Majestic Announces Voting Results from Annual General Meeting
May 22, 2023
CORRECTION FROM SOURCE: First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 22, 2023
First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 4, 2023
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 20, 2023
First Majestic Produces 7.6 million AgEq Oz in Q1 Consisting of 2.5 million Silver Ounces and 60,594 Gold Ounces; Announces VP Management Changes
March 31, 2023
First Majestic Announces 2022 Mineral Reserve and Mineral Resource Estimates
March 30, 2023
First Majestic Announces Closing Sale of La Guitarra to Sierra Madre
March 20, 2023
First Majestic Temporarily Suspends Mining Activities at Jerritt Canyon
March 20, 2023
First Majestic Renews Share Repurchase Program
February 23, 2023
First Majestic Announces Financial Results for Q4 2022, FY2022 & Quarterly Dividend Payment
January 19, 2023
First Majestic Produces 7.6M AgEq Oz in Q4 2022 and a Record 31.3M AgEq Oz in 2022; Annual Retail Silver Bullion Sales Increase 27% to New Record; Announces 2023 Production and Cost Guidance and Conference Call Details
December 21, 2022
First Majestic Announces Closing Sale of Royalty Portfolio to Metalla
December 7, 2022
First Majestic Announces Proposed Sale of The La Parrilla Silver Mine for Up To US$33.5 Million
November 28, 2022
First Majestic Announces the Proposed Sale of Its Royalty Portfolio for US$20.0 Million
November 9, 2022
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
November 1, 2022
First Majestic Reports Continued Exploration Success Intersecting 19.97 g/t Au over 20.9m Near Active Underground Mining at Jerritt Canyon
October 18, 2022
First Majestic Produces a New Record of 8.8 Million AgEq Ounces in the Third Quarter Consisting of 2.7 Million Silver Ounces and 67,072 Gold Ounces
August 23, 2022
First Majestic Intersects 19.35 g/t Au over 23.2m in Potential New High-Grade Gold Zone at Jerritt Canyon; Follow-up Drilling Confirms Presence of High-Grade Gold Pod near Active Underground Mining in Smith Mine
August 8, 2022
First Majestic Releases 2021 Sustainability Report
August 4, 2022
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2022
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
July 20, 2022
First Majestic Produces 7.7M Silver Eqv. Oz in the Second Quarter Consisting of 2.8M Oz Silver and 59,391 Oz Gold; Announces Updated 2022 Guidance and Conference Call Details
May 31, 2022
First Majestic Intersects 8.39 g/t Au over 29.7m near Active Underground Mining at Jerritt Canyon
May 27, 2022
First Majestic Announces Voting Results from Annual General & Special Meeting
May 25, 2022
First Majestic Announces Proposed Sale of the La Guitarra Silver Mine
May 12, 2022
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 18, 2022
First Majestic Produces 7.2M Silver Eqv. Oz in the First Quarter Consisting of 2.6M Oz Silver and 58,892 Oz Gold
March 31, 2022
First Majestic Announces 2021 Mineral Reserve and Resource Estimates
March 17, 2022
First Majestic Renews Share Repurchase Program
March 10, 2022
First Majestic Announces Financial Results for Q4 2021, FY2021 & Quarterly Dividend Payment; Appoints New CFO
January 18, 2022
First Majestic Produces New Quarterly Record of 8.6M Silver Eqv. Oz in Q4 2021 and Achieves FY2021 Guidance with New Annual Production Record of 26.9M Silver Eqv. Oz; Announces 2022 Guidance and Today's Conference Call Details; Appoints Interim CFO
December 2, 2021
First Majestic Completes US$230 Million Convertible Senior Notes Offering
November 30, 2021
First Majestic Prices Offering of Convertible Senior Notes
November 29, 2021
First Majestic Launches Offering of Convertible Senior Notes
November 24, 2021
First Majestic Files Updated Technical Report for the Santa Elena Silver/Gold Mine in Sonora, Mexico Including a Positive Pre-Feasibility Study for the Ermitaño Project; Appoints Vice-President of Exploration
November 4, 2021
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2021
First Majestic Produces a Record 7.3m Silver Eqv. Oz in the Third Quarter Consisting of 3.3m Oz Silver and 54,525 Oz Gold; Suspended Silver Sales and Held 1.4m Oz of Silver in Inventory at Quarter End
August 16, 2021
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 13, 2021
First Majestic Produces 3.3M Oz Silver and 46,545 Oz Gold (6.4M Silver Eqv. Oz) in the Second Quarter of 2021 - Announces Updated 2021 Guidance, New Board Appointment and Conference Call Details
May 28, 2021
First Majestic Announces Voting Results from Annual General Meeting and Management Update
May 6, 2021
First Majestic Reports First Quarter Financial Results, Inaugural Dividend Payment, and Appointment of VP Operations
April 30, 2021
First Majestic Completes Acquisition of Jerritt Canyon Mine in Nevada, USA and Private Placement with Eric Sprott
April 14, 2021
First Majestic Produces 2.9M Oz Silver and 23,873 Oz Gold (4.5M Silver Eqv. Oz) in the First Quarter of 2021
March 31, 2021
First Majestic Files Updated Technical Reports, 2020 Mineral Reserve and Mineral Resource Estimates & Appoints New Director
March 30, 2021
First Majestic Updates ESG Sustainability Activities Aimed at Helping Local Communities and Improving the Environment
March 18, 2021
First Majestic Renews Share Repurchase Program
March 12, 2021
First Majestic Announces Acquisition of Jerritt Canyon Mine in Nevada, USA
March 10, 2021
First Majestic Responds to Inaccurate Media Reports and Provides Update on Tax Dispute with the Government of Mexico
March 5, 2021
First Majestic Awarded as Socially Responsible Business in Mexico
March 2, 2021
First Majestic Initiates International Arbitration Request under NAFTA against the Government of Mexico
February 18, 2021
First Majestic Announces Financial Results for Q4 2020, FY2020 and Appointment of New Director
January 28, 2021
First Majestic Responds to Market Activity
January 20, 2021
First Majestic Produces 5.5M Silver Eqv. Oz in Q4 2020 (3.5M Silver Oz and 26K Gold Oz); Provides 2021 Outlook and Conference Call Details
December 7, 2020
First Majestic Announces Inaugural Dividend Policy
November 12, 2020
First Majestic to Appeal Circuit Court Decision to Nullify APA
November 5, 2020
First Majestic Reports Third Quarter Financial Results – Generates Record Revenues, Cash Flows and Earnings
October 13, 2020
First Majestic Produces 3.2M Oz Silver and 25,771 Oz Gold (5.2M Silver Eqv. Oz) in the Third Quarter
September 25, 2020
First Majestic Provides SAT Tax Dispute Update
September 21, 2020
First Majestic Announces Filing of Early Warning Report for Acquisition of Shares of Silver Dollar Resources Inc.
September 17, 2020
First Majestic Announces Closing of CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 10, 2020
First Majestic Announces CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 1, 2020
First Majestic Publishes ESG and Sustainability Report
August 6, 2020
First Majestic Reports Second Quarter Financial Results
July 15, 2020
First Majestic Produces 3.5 Million Silver Equivalent Ounces from Partial Operations in Second Quarter; Updates 2020 Guidance & Announces Conference Call Details
July 2, 2020
First Majestic Completes Acquisition of Springpole Silver Stream
June 11, 2020
First Majestic Acquires Silver Stream on First Mining’s Springpole Project
June 10, 2020
First Majestic Announces Voting Results from Annual General Meeting and Appointment of New Director
May 14, 2020
First Majestic Reports First Quarter Financial Results; Temporarily Postpones the Sale of Silver and Gold Due to COVID-19; Announces Operational Restart Procedures
May 13, 2020
First Majestic Initiates NAFTA Arbitration Process Against Mexico for Violating International Law
April 14, 2020
First Majestic Produces 6.2 Million Silver Equivalent Ounces in First Quarter
April 3, 2020
First Majestic Provides Update on Operations in Response to COVID-19
March 30, 2020
First Majestic Updates 2019 Mineral Reserve and Resource Estimates
March 27, 2020
First Majestic Acquires Shares in GR Silver - Early Warning
March 18, 2020
First Majestic Renews Share Repurchase Program
February 24, 2020
First Majestic Announces High-Grade Drill Results from its 2019 Exploration Program at the Ermitaño project within the Santa Elena land package
February 19, 2020
First Majestic Announces Financial Results for Q4 and Year End 2019
February 3, 2020
First Majestic Announces New Chief Operating Officer
January 21, 2020
First Majestic Announces 2020 Production and Cost Guidance
January 15, 2020
First Majestic Produces 6.2M Ounces in Q4 and Record 25.6M Ounces in 2019; Announces New Director & Conference Call Details
November 7, 2019
First Majestic Reports Third Quarter Financial Results
October 15, 2019
First Majestic Produces 6.6 Million Silver Equivalent Ounces in Third Quarter
August 7, 2019
First Majestic Reports Second Quarter Financial Results and Updates 2019 Production and Cost Guidance
July 15, 2019
First Majestic Produces 6.4 Million Silver Equivalent Ounces in Second Quarter; Provides Conference Call Details
May 24, 2019
First Majestic Announces Voting Results from Annual General Meeting and Management Changes
May 9, 2019
First Majestic Reports First Quarter Financial Results
May 1, 2019
First Majestic First Quarter Financial Results to be Released on May 9
April 16, 2019
First Majestic Produces 6.3 Million Silver Equivalent Ounces in First Quarter
March 29, 2019
First Majestic Updates 2018 Mineral Reserve and Resource Estimates
March 19, 2019
First Majestic Renews Share Repurchase Program
February 25, 2019
First Majestic Announces High-Grade Drill Results from 2018 Exploration Program at the Ermitaño Silver/Gold Project; Permitting Status Update
February 25, 2019
First Majestic Announces Financial Results for Q4 and Year End 2018
January 14, 2019
First Majestic Produces a Record 22.2M Silver Eqv. Oz in 2018; Announces Higher 2019 Production Outlook & Conference Call Details
December 27, 2018
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
November 7, 2018
First Majestic Reports Third Quarter Financial Results
November 6, 2018
First Majestic Announces Updated Release Date for Third Quarter Financial Results
October 15, 2018
First Majestic Files Preliminary Base Shelf Prospectus
October 15, 2018
First Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter
September 10, 2018
First Majestic and Evrim Resources Agree to Exercise of Ermitaño and Cumobabi Option Agreements
August 13, 2018
First Majestic Reports Second Quarter Financial Results
July 16, 2018
First Majestic Produces a Record 5.1M Silver Equivalent Ounces in Second Quarter; Increases 2018 Production Guidance to 20.5M - 22.6M Silver Equivalent Ounces
May 25, 2018
First Majestic Announces Voting Results from Annual General Meeting
May 10, 2018
First Majestic Announces New Stream Agreement at San Dimas Mine and New Credit Facility
May 10, 2018
First Majestic Completes Acquisition of Primero
May 9, 2018
First Majestic Announces Amendments to Advance Notice Policy
May 9, 2018
First Majestic Reports First Quarter Financial Results
May 9, 2018
Primero Announces Receipt of Mexican Antitrust Clearance for Arrangement With First Majestic and Files First Quarter Financial Statements on SEDAR
April 19, 2018
First Majestic Produces 3.9M Silver Eqv. Oz in First Quarter
March 29, 2018
First Majestic Updates Mineral Reserve and Resource Estimates for 2017 and Files Form 40-F Annual Report
March 19, 2018
First Majestic Renews Share Repurchase Program
March 13, 2018
Primero Announces Shareholders Vote In Favour Of Transaction With First Majestic
February 28, 2018
First Majestic Announces Financial Results for Q4 and Year End 2017
February 15, 2018
First Majestic announces Exercise and Closing of Over-Allotment Option
January 29, 2018
First Majestic Completes US$150 Million Convertible Senior Notes Offering
January 25, 2018
First Majestic Prices Offering of Convertible Senior Notes
January 24, 2018
First Majestic Launches Offering of Convertible Senior Notes
January 16, 2018
First Majestic Produces 16.2M Silver Eqv. Oz in 2017 (4.1M Silver Eqv. Oz in Q4); Announces 2018 Production Outlook and Cost Guidance
January 12, 2018
First Majestic Silver Announces Friendly Acquisition of Primero Mining and Restructured Stream with Wheaton Precious Metals
January 9, 2018
First Majestic Provides Review of 2017 Exploration Program and Plans for 2018
December 20, 2017
First Majestic files updated NI 43-101 technical reports on its Del Toro, La Parrilla and San Martin Silver Mines
November 2, 2017
First Majestic Reports Third Quarter Financial Results
October 17, 2017
First Majestic Produces 4.0M Silver Eqv. Oz in Third Quarter
October 3, 2017
First Majestic Reports Accident at La Encantada
August 3, 2017
First Majestic Reports Second Quarter Financial Results
July 11, 2017
First Majestic Produces 3.9M Silver Eqv. Oz in Second Quarter
June 2, 2017
First Majestic to Resume Operations at La Encantada
May 26, 2017
First Majestic Announces Voting Results from Annual General Meeting
May 24, 2017
First Majestic Announce illegal Blockade at La Encantada
May 4, 2017
First Majestic Reports First Quarter Financial Results
April 20, 2017
First Majestic Produces 4.3M Silver Eqv. Oz in First Quarter
March 31, 2017
First Majestic Updates Mineral Reserve and Resource Estimates for YE2016 and Files Form 40-F Annual Report
March 16, 2017
First Majestic Renews Share Repurchase Program
February 28, 2017
First Majestic Appoints New COO and New Member to Board of Directors
February 22, 2017
First Majestic Announces Financial Results for Q4 and Year End 2016
January 17, 2017
First Majestic Produces a Record 18.7M Silver Eqv. Oz in 2016 (4.4M Silver Eqv. Oz in Q4); Announces 2017 Production Outlook and Cost Guidance
November 9, 2016
First Majestic Reports Third Quarter Financial Results
October 27, 2016
Third Quarter Financial Results to be Released on November 9
October 13, 2016
First Majestic Achieves New Record in Silver Production; Produces 4.5 Million Silver Eqv. Ounces in Third Quarter
September 15, 2016
First Majestic Announces Resignation of Ramon Davila From Board of Directors
August 10, 2016
First Majestic Reports Second Quarter Financial Results
July 25, 2016
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 10
July 12, 2016
First Majestic Produces 4.7 Million Silver Eqv. Ounces in Second Quarter
May 27, 2016
First Majestic Announces Election of Directors
May 16, 2016
First Majestic Silver Corp. Changes Annual General Meeting Time
May 12, 2016
First Majestic Silver Corp. Announces Closing of C$50 Million Bought Deal Financing; Over-Allotment Option Fully Exercised
May 10, 2016
First Majestic Reports First Quarter Financial Results
May 5, 2016
First Majestic Revises Date of First Quarter Financial Results to May 10
April 25, 2016
First Majestic Silver Corp.: First Quarter Financial Results to be Released on May 11
April 22, 2016
First Majestic Silver Corp. Announces C$50 Million Bought Deal Financing
April 14, 2016
First Majestic Produces a Record 5.1 Million Silver Eqv. Ounces in First Quarter
March 31, 2016
First Majestic Updates Mineral Reserve and Resource Estimates for Year End 2015 and Files Form 40-F Annual Report
March 28, 2016
First Majestic Silver Corp. Announces Updated La Encantada NI 43-101 Technical Report
March 14, 2016
First Majestic Renews Share Repurchase Program
February 25, 2016
First Majestic Announces Financial Results for Q4 and Year End 2015
February 11, 2016
Fourth Quarter and Year End Financial Results to Be Released on February 25, 2016
February 11, 2016
First Majestic Secures $60 Million Credit Facility
January 19, 2016
First Majestic Produces 16.1M Silver Eqv. Oz in 2015 (4.8M Silver Eqv. Oz in Q4); Announces 2016 Production Outlook and Cost Guidance
November 16, 2015
First Majestic Reports Third Quarter Financial Results
October 14, 2015
First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3'15
October 1, 2015
First Majestic Completes Acquisition of SilverCrest
September 25, 2015
First Majestic and Silvercrest Announce Shareholder Approval of Plan of Arrangement
September 15, 2015
Leading Independent Advisory Firms ISS and Glass Lewis Recommend that SilverCrest and First Majestic Shareholders Vote FOR the Plan of Arrangement
August 27, 2015
First Majestic and SilverCrest Announce Receipt of Interim Order and Mailing of Meeting Materials
August 11, 2015
First Majestic Reports Second Quarter Financial Results and La Encantada Operational Update
July 30, 2015
First Majestic Silver: Second Quarter Financial Results to Be Released on August 11
July 27, 2015
First Majestic Announces Friendly Acquisition of SilverCrest Mines
July 9, 2015
First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15
May 22, 2015
First Majestic Announces Election of Directors
May 7, 2015
First Majestic Reports First Quarter Financial Results
April 23, 2015
First Quarter Financial Results to be Released on May 7
April 22, 2015
First Majestic Silver Corp. Announces Closing of C$30 Million Bought Deal Financing
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 6, 2015
First Majestic Announces Promotion of Martin Palacios to Chief Transformation Officer
April 6, 2015
First Majestic Announces Acquisition of Shares of First Mining Corp.
April 5, 2015
First Majestic Silver Corp. Announces C$30 Million Bought Deal Financing
March 31, 2015
Announces New La Guitarra NI 43-101 Technical Report
March 11, 2015
First Majestic Renews Share Repurchase Program
February 23, 2015
First Majestic Announces Financial Results for Q4 and Year End 2014
February 2, 2015
Fourth Quarter and Year End Financial Results to be Released on February 23, 2015
January 13, 2015
First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance
December 1, 2014
Supreme Court of Canada Dismisses Appeal Application by Hector Davila Santos
November 12, 2014
First Majestic Reports Third Quarter Financial Results
November 6, 2014
Conference Call Scheduled on November 12, 2014
October 31, 2014
Third Quarter Financial Results to be Released on November 12, 2014
October 14, 2014
Produces 3.5 Million Silver Eqv. Ounces in Q3; Postpones the Sale of 934K Silver Ounces of Inventory
August 22, 2014
First Majestic to List on the Mexican Stock Exchange
August 13, 2014
First Majestic Reports Second Quarter Financial Results
July 21, 2014
Second Quarter Financial Results to be Released on August 13, 2014
July 14, 2014
New Record of 3.86 million Silver Eqv. Ounces Produced in Q2; Announces Spin-out of Non-Core Exploration Properties
June 9, 2014
First Majestic Wins Application to Dismiss Appeal
May 29, 2014
First Majestic Announces Election of Directors
May 13, 2014
First Majestic Reports First Quarter Financial Results
May 1, 2014
First Quarter Financial Results to be Released on May 13
April 15, 2014
First Majestic Announces US$30M Forward Sale Contract on Lead Production
April 8, 2014
First Majestic's Q1 Production Reaches New Record of 3.63 million Silver Equivalent Ounces
April 4, 2014
First Majestic Appoints VP of Technical Services
March 27, 2014
First Majestic Updates Reserves and Resource Estimates and Files Form 40-F Annual Report
March 10, 2014
First Majestic Announces Extension of Share Repurchase Program
March 3, 2014
First Majestic Announces Changes to Operations and Geological Teams
February 26, 2014
First Majestic Announces Financial Results for Q4 and Year End 2013
February 3, 2014
Fourth Quarter and Year End Financial Results to be Released on February 26, 2014
January 14, 2014
First Majestic becomes a Senior Silver Producer; Produces 10.64M Ounces of Silver in 2013; Projects 12.70M to 13.35M Ounces of Silver in 2014
December 23, 2013
First Majestic Announces Retirement of Robert Young from Board of Directors
December 4, 2013
Silver Doré Production Commences at the Del Toro Silver Mine
November 12, 2013
First Majestic Reports Third Quarter Financial Results
October 30, 2013
Third Quarter Financial Results to be Released on November 12th
October 24, 2013
Appeal Against First Majestic Dismissed
October 16, 2013
First Majestic Produces a New Record of 3.37 million Silver Equivalent Ounces
September 30, 2013
First Majestic Applies to Dismiss Appeal of Positive Judgment for US$93.84 million
August 13, 2013
First Majestic Reports Second Quarter Financial Results
July 15, 2013
Second Quarter Financial Results to be Released on August 13th
July 10, 2013
First Majestic Produces a New Quarterly Record of 3.27 Million Silver Eqv. Ounces
July 2, 2013
Payment of CDN$14.85 million Received in Court Litigation
May 28, 2013
Updated San Martin NI 43-101 Technical Report and Economic Assessment
May 24, 2013
First Majestic Announces Election of Directors
May 15, 2013
First Majestic Reports First Quarter Earnings of $26.5 million on Revenues of $67.1 million
May 7, 2013
First Quarter Financial Results to be Released on May 15th
May 2, 2013
First Majestic Announces Completion of La Guitarra's Expansion to 500 tpd
April 26, 2013
First Majestic Receives Positive Judgment for US$89.6 in Court Litigation
April 17, 2013
First Majestic Earns Socially Responsible Business Distinction Award for Fifth Consecutive Year
April 15, 2013
First Majestic Produces Another Quarterly Record 2.73 Million Silver Eqv. Ounces
April 9, 2013
First Majestic Silver: Del Toro Silver Mine Flotation Circuit Deemed Commercial
March 28, 2013
First Majestic Files Form 40-F Annual Report
March 11, 2013
First Majestic Announces Share Repurchase Program
February 26, 2013
First Majestic Announces Financial Results for Q4 and Year End 2012
February 20, 2013
First Majestic Silver to Announce Fourth Quarter and Year End 2012 Financial Results
February 19, 2013
First Majestic Elects Not to Exercise Right to Match Coeur's Offer for Orko
February 14, 2013
First Majestic Considering Superior Offer from Coeur to Acquire Orko Silver
January 25, 2013
First Majestic Silver Corp.: Production Commences at the Del Toro Silver Mine
January 9, 2013
First Majestic Silver Corp.: Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M Silver Ounces) in Q4; Produced a Record 9.1M Silver Eqv. Ounces (8.3M Silver Ounces) in 2012
January 2, 2013
First Majestic Appoints VP of Operations
December 19, 2012
First Majestic Announces US$50M Forward Sale Contract on Base Metals
December 16, 2012
First Majestic Announces Friendly Acquisition of Orko Silver
November 14, 2012
First Majestic Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increase of 4%
November 7, 2012
First Majestic Silver Corp.: Third Quarter Financial Results to Be Released on November 14th
October 10, 2012
First Majestic Produces a Record 2.44 Million Silver Equivalent Ounces in Third Quarter
August 27, 2012
First Majestic Announces Appointment of VP of Exploration
August 21, 2012
First Majestic Silver Corp.: Updated Del Toro NI 43-101 Technical Report & Final Permit Received
August 16, 2012
First Majestic Recognized as a Leader in Corporate Social Responsibility
August 14, 2012
First Majestic Reports Second Quarter Financial Results
August 7, 2012
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 14th
July 17, 2012
First Majestic Produces 2.1 Million Silver Equivalent Ounces in Second Quarter
July 3, 2012
First Majestic Completes Acquisition of Silvermex Resources
June 26, 2012
Silvermex Securityholders Approve Plan of Arrangement With First Majestic
May 22, 2012
First Majestic Silver Corp.: Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
May 10, 2012
First Majestic Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compared With Q1 2011; Revenues Top $57.8M, Up 5% From Q1 2011
April 16, 2012
First Majestic Silver Corp.: First Quarter Production Results and Full Commencement of Commercial Production at La Parrilla
April 3, 2012
First Majestic Announces Friendly Acquisition of Silvermex Resources
March 30, 2012
First Majestic Files Form 40-F Annual Report
March 5, 2012
First Majestic Announces New Record Earnings & Cash Flows for 2011
February 24, 2012
First Majestic Silver to Announce Fourth Quarter and Year End 2011 Financial Results
January 24, 2012
First Majestic Silver Corp.-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro Construction Update
January 12, 2012
First Majestic Silver Corp. Achieved Record Production of 1.96M Silver Ounces (2.1M Silver Eqv. Ounces) in Q4; Produced a Record 7.6M Silver Eqv. Ounces in 2011
January 4, 2012
First Majestic Appoints Chief Information Officer
December 30, 2011
First Majestic Names Douglas Penrose as Chairman
November 9, 2011
First Majestic Silver Corp.: Earnings Hit $27.8 Million in Third Quarter
October 26, 2011
First Majestic Silver Corp.: Third Quarter Financial Results to be Released on November 9th
October 12, 2011
First Majestic Announces Q3 Production Results and Commences Commercial Production at La Parrilla
October 7, 2011
First Majestic Silver Corp.: Third Quarter Production Results to Be Released on October 12, 2011-Conference Call Scheduled
September 20, 2011
First Majestic Silver Corp.: First Stage of Expansion at the La Parrilla Processing Plant Completed
September 13, 2011
First Majestic Silver Corp.: Mill Capacity at La Parrilla to Reach 2,000 tpd Following Positive NI 43-101 Pre-Feasibility Study
August 11, 2011
First Majestic Silver Corp.: Record Earnings of $30.6 million in Second Quarter
August 3, 2011
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 11th
July 7, 2011
First Majestic Silver Corp.: Another Record Quarter of Silver Production
May 16, 2011
First Majestic Earns a Record $23.9 Million in First Quarter of 2011
April 7, 2011
First Majestic Silver Corp.: Silver Production Up 25%; Reaches 97% Pure Silver and Maintains Status as "Purest Silver Company in the World"
March 31, 2011
First Majestic Files Form 40-F Annual Report
March 31, 2011
First Majestic Silver Corp.: Update on the Del Toro Silver Mine
February 28, 2011
First Majestic Silver Corp.: 2010 Audited Financial Results Show Record Earnings & Cash Flows; A Breakout Year for First Majestic
January 11, 2011
First Majestic Silver Corp.: Production Up 72% to 6.53 Million oz Ag in 2010; Exceeds Guidance by 9%
December 13, 2010
First Majestic to List on the New York Stock Exchange
December 6, 2010
First Majestic Silver Corp.: La Parrilla Expansion to 1,600 Tonnes Per Day
November 10, 2010
First Majestic Acquires Surface Rights, Royalties and Infrastructure at Real De Catorce Silver Project
November 9, 2010
First Majestic Silver Corp.: Another Record Quarter of Earnings and Cash Flows
October 6, 2010
First Majestic Silver Corp.: Another New Record for Silver Production; 1,823,370 oz Silver Produced in Q3
August 16, 2010
First Majestic Silver Corp.: Record Earnings and Cash Flows. Purest Silver Producer With 93% of Revenue From Silver Production
July 8, 2010
First Majestic Silver Corp.: New Record for Silver Production; Produces 1,538,798 oz Silver
May 13, 2010
First Majestic Silver Corp.: First Quarter Marks 5th Consecutive Quarter of Net Income
April 22, 2010
First Majestic Silver Corp.: 2nd Year Running for Mexican Distinction as a "Socially Responsible Business"
April 13, 2010
First Majestic Silver Corp.: Conference Call to discuss First Quarter Silver Production and Year End Financial Results
April 12, 2010
First Majestic Silver Corp.: Production Increases by 30% to 1,619,403 Equivalent Ounces Silver
April 8, 2010
First Majestic Silver Corp.: La Encantada Achieves Commercial Production
March 24, 2010
First Majestic Silver Corp.: Conference Call to Discuss First Quarter Silver Production and Year End Financial Results
March 22, 2010
First Majestic Silver Corp.: Year End & Fourth Quarter Financial Results
January 11, 2010
First Majestic Silver Corp.: Production Increases by 18%, Reaches New Record
November 26, 2009
First Majestic Silver Corp.: La Encantada Opening Ceremony & Production of First Silver Precipitates
November 13, 2009
First Majestic Completes Acquisition of Normabec Mining Resources; Normabec Spins Out Brionor Resources Inc.
November 12, 2009
First Majestic Silver Corp.: Record Third Quarter Financial Results
November 6, 2009
Normabec Shareholders Approve Plan Of Arrangement With First Majestic
October 13, 2009
First Majestic Silver Corp.: La Encantada Expansion Nearing Completion
October 6, 2009
First Majestic Silver Corp.: Third Quarter Production Results
September 18, 2009
First Majestic Silver Corp.: Settlement of Current Liabilities Closes
September 16, 2009
First Majestic Silver Corp.: Second Tranche of Non-Brokered Private Placement Closes
September 14, 2009
First Majestic to Acquire Normabec Mining Resources
August 20, 2009
First Majestic Silver Corp.: First Tranche of Non-Brokered Private Placement Closes
August 13, 2009
First Majestic Silver Joins OTCQX
August 12, 2009
First Majestic Silver Corp.: Non-Brokered Private Placement and Debt Settlement
July 20, 2009
Second Quarter Production Results
July 16, 2009
Update of Litigation
May 14, 2009
First Majestic Silver Corp.: First Quarter Financial Results
April 27, 2009
First Majestic Silver Corp.: Silver Production Increases 4% in 1st Quarter
March 31, 2009
2008 Year End Financial Results
March 23, 2009
First Majestic Receives Mexican Distinction as a "Socially Responsible Business"
March 17, 2009
First Majestic Silver Corp.: La Parrilla Receives "Clean Industry Certification"
March 5, 2009
First Majestic Silver Corp.: Closing of $21.2 Million Offering
February 26, 2009
First Majestic Silver Corp.: Resource Disclosure Clarification
February 19, 2009
First Majestic Announces Pricing of Offering
February 18, 2009
First Majestic Announces C$25 Million Offering
February 17, 2009
First Majestic Silver Corp.: La Parrilla Silver Mine Updates NI 43-101 Resource
January 20, 2009
First Majestic Silver Corp.: San Martin Updated NI 43-101 Report Increasing Reserves/Resources by 45.81%
January 13, 2009
First Majestic Silver Corp.: Production Increases 27% in 4th Quarter
December 23, 2008
First Majestic Silver Corp.: La Encantada Updated NI 43-101 Report Increasing Reserves By 183%
November 19, 2008
First Majestic Silver Corp.: Operations Update
November 14, 2008
First Majestic Silver Corp.: Third Quarter Financial Results
October 28, 2008
First Majestic Silver Corp.: Another Major Intersection at Del Toro Silver Mine, Drill Hole Cuts 62.05 Metres (203.58 ft) of 422 g/t Ag, 6.29% Pb, 6.78% Zn & 0.74 g/t Au
October 23, 2008
First Majestic Silver Corp.: 3rd Quarter Production Results
October 10, 2008
First Majestic Silver Corp.: Del Toro Silver Mine NI 43-101 Resources of 57 Million Ag eqv. Ounces
September 11, 2008
First Majestic Silver Corp.: Many Positive Developments Underway
August 15, 2008
First Majestic Silver Corp.: Second Quarter Financial Results
July 17, 2008
First Majestic Silver Corp.: Major Intersection at San Juan Silver Mine; Drill Hole Intersects 74.20 Metres (243 ft) of 359 g/t Ag, 7.07% Pb & 7.60% Zn
July 15, 2008
First Majestic Silver Corp.: 2nd Quarter Production Shows Continued Ramp-Up
June 10, 2008
First Majestic Silver Corp.: Major Expansion Launched at La Encantada Silver Mine
May 16, 2008
First Majestic Silver Corp.: Record First Quarter Financial Results
April 29, 2008
First Majestic Silver Corp.: 1st Quarter Production Results
April 22, 2008
First Majestic Silver Corp.: Commissioning of Flotation Circuit at the San Martin Silver Mine
April 17, 2008
First Majestic Silver Corp.: 2007 Year End Financial Results
April 4, 2008
First Majestic Silver Corp.: Exercise and Closing of Over-Allotment Option
April 1, 2008
First Majestic Silver Corp.: Discovery of New High Grade Ore Shoot on the Vacas Vein at the La Parrilla Silver Mine
March 25, 2008
First Majestic Silver Corp.: Closing of $45,475,000 Offering
March 5, 2008
First Majestic Silver Corp.: Drill Intersects 39.6 Metres of 199 g/t Ag, 3.92% Pb & 4.02% Zn at San Juan Silver Mine
January 30, 2008
La Parrilla Silver Mine Update and New NI 43-101 Resource
January 17, 2008
Another Record Quarter of Silver Production
January 14, 2008
Toronto Stock Exchange Listing
December 13, 2007
TSX Conditional Approval
December 3, 2007
Update on the Chalchihuites Group of Properties
November 29, 2007
Highlights from 3rd Quarter Financial Statements
November 13, 2007
Update on the Cuitaboca Silver Project
October 23, 2007
Another Record Quarter of Silver Production
August 30, 2007
Highlights from 2nd Quarter Financial Statements
July 26, 2007
Second Quarter Silver Production Increases
July 4, 2007
La Parrilla Silver Mine Update and New NI 43-101 Resource
June 18, 2007
La Encantada Silver Mine Update and new NI 43-101 Resource
May 31, 2007
Highlights from 1st Quarter Financial Statements
May 28, 2007
San Martin Silver Mine Update and new NI 43-101 Resource
May 10, 2007
Closing of $34,415,000 Private Placement
April 28, 2007
Silver Production increases by 38%
April 20, 2007
Financing Amended
March 28, 2007
First Majestic Files Preliminary Short Form Prospectus

Subscribe