Silver Price: $25.12
NYSE: AG $5.57
TSX: FR $7.56
Frankfurt: FMV €5.16

First Majestic Reports Second Quarter Financial Results

August 14, 2012

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 14, 2012) - FIRST MAJESTIC SILVER CORP. (TSX:FR)(NYSE:AG)(FRANKFURT:FMV) (the "Company" or "First Majestic") is pleased to announce the unaudited condensed interim consolidated financial results for the Company for the second quarter ending June 30, 2012. The full version of the financial statements and the management discussion and analysis can be viewed on the Company's web site at www.firstmajestic.com or on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

2012 SECOND QUARTER HIGHLIGHTS

  • Silver produced increased by 8% to 1,917,248 ounces compared to 1,780,379 ounces in Q2 2011
  • Increased silver equivalent production by 14% to 2,102,222 ounces compared to Q2 2011
  • Revenue of $54.8 million, a 19% decrease from Q2 2011 while average silver prices fell by 27%
  • Mine Operating Earnings totaling $31.1 million
  • Cash Flow per Share (non-GAAP) of $0.29, a decrease of 35% from Q2 2011
  • Basic Earnings per Share amounted to $0.14, representing a 51% decrease from Q2 2011
  • Adjusted Earnings per Share (non-GAAP) amounted to $0.19 after removing legal fees for the First Silver trial, the acquisition costs for the Silvermex Resources Inc. and losses from silver futures and marketable securities
  • Total Production Cost per Tonne decreased to $26.97, a 10% reduction compared to Q2 2011
  • Total Cash Cost was $8.83 per ounce, up only 6% compared to Q2 2011
  • Cash and Cash Equivalents at June 30, 2012 totalled $70.9 million and Working Capital of $94.6 million
  • In addition to cash, First Majestic was carrying 574,000 PSLV (Sprott Physical Silver Trust) units at quarter end with an approximate market value of $6.65 million and 100 Silver Futures contracts representing 500,000 ounces of silver valued at $1.7 million including the unrealized gain and the margin requirement. The Company is currently holding 150 contracts representing 750,000 ounces of silver at an average cost basis of $27.277.
2012 SECOND QUARTER HIGHLIGHTS TABLE
Second
Quarter
2012
Second
Quarter
2011
Change
Operating
Silver Equivalent Ounces Produced 2,102,222 1,843,830 14%
Silver Ounces Produced (excluding equivalent ounces from by-products) 1,917,248 1,780,379 8%
Payable Silver Ounces Produced(1) 1,888,132 1,761,697 7%
Total Cash Costs per Ounce(2) $8.83 $8.32 6%
Total Production Cost per Tonne(2) $26.97 $30.03 -10%
Average Revenue per Payable Equivalent Ounces Sold ($/eq. oz.)(2) $28.69 $39.08 -27%
Financial
Revenues ($ millions) $54.8 $68.0 -19%
Mine Operating Earnings ($ millions) $31.1 $46.8 -34%
Net Earnings After Taxes ($ millions) $15.3 $30.6 -50%
Operating Cash Flows Generated Before Movements in Working Capital ($ millions) $30.6 $46.4 -34%
Cash and Cash Equivalents at June 30 ($ millions) $70.9 $105.0 -32%
Working Capital at June 30 ($ millions) $94.6 $100.9 -6%
Shareholders
Earnings Per Share - Basic $0.14 $0.30 -51%
Cash Flow Per Share(2) $0.29 $0.45 -35%
Weighted Average Shares Outstanding for the Periods Ended June 30 105,798,950 103,396,753 2%
Common Shares Outstanding after the acquisition of Silvermex 115,340,851
  1. Payable Silver Ounces Produced is equivalent to Silver Ounces Produced less metal deductions from smelters and refineries.
  2. The Company reports non-GAAP measures which include Total Cash Costs per Ounce, Total Production Cost per Tonne, Average Revenue per Payable Equivalent Ounces Sold and Cash Flow Per Share Before Movements in Working Capital. These measures are widely used in the mining industry as a benchmark for performance, but do not have a standardized meaning and may differ from methods used by other companies with similar descriptions.

Keith Neumeyer, President and CEO of First Majestic, states, "As usual, First Majestic is working on multiple fronts to improve the business. During this past quarter, we successfully added a third ball mill at the La Encantada mill allowing for mine ore production to reach 1,800 tpd, which as expected, is resulting in improved recoveries. At La Parrilla, the new processing mill reached name plate capacity in the quarter averaging 2,040 tpd and continues to operate as expected. Furthermore, La Parrilla has been deemed as the Company's blueprint model for all future personnel training programs and activities. At Del Toro, mill construction and underground development to access the third ore body at San Juan remains a key focus ahead of initial production scheduled in the fourth quarter. And lastly, the addition of the La Guitarra Silver Mine to our portfolio brings another area of focus. In addition to immediate production, this very large and exciting land package will keep us busy for many years to come."

FINANCIAL HIGHLIGHTS

  • Increased silver equivalent production by 14% compared to the second quarter of 2011, though average silver prices fell 27%, the Company managed to limit the reduction of revenues by 19% compared to the second quarter of 2011.
  • Adjusted EPS (a non-GAAP measure) for the three months ended June 30, 2012 was $0.19, after removing $0.8 million in acquisition costs for Silvermex, $1.1 million in legal fees for the First Silver trial and $3.6 million in losses from investment in silver futures and marketable securities.
  • Cash flows from operations before movements in non-cash working capital and income taxes in the second quarter of 2012 decreased by 34% to $30.6 million ($0.29 per share) compared to $46.4 million ($0.45 per share) in the second quarter of 2011.
  • Continued to focus on cost control in a lower silver price market. Production costs per tonne decreased 10% to $26.97 per tonne compared to $30.03 per tonne in the second quarter of 2011, reflecting efficiencies from economies of scale as a result of 28% increase in tonnes of ore milled during the second quarter of 2012.
  • Subsequent to quarter end, on July 3, 2012, the Company completed the acquisition of Silvermex Resources Inc. ("Silvermex"), whereby First Majestic acquired all of the issued and outstanding common shares of Silvermex. Total consideration for the transaction was valued at approximately $137.0 million at the time of completion. Silvermex's La Guitarra Silver Mine, located in the State of Mexico, has now become First Majestic's fourth operating mine and is expected to contribute between 320,000 to 340,000 ounces of silver and approximately 70,000 ounces of silver equivalent from gold to the Company's consolidated production in the second half of 2012.
  • Cash cost per ounce (a non-GAAP measure) for the second quarter of 2012 was $8.83, an increase of 6% compared to $8.32 in the second quarter of 2011. Cash cost per ounce was slightly higher primarily due to a decrease in consolidated head grades to 166 g/t Ag compared to 208 g/t Ag in the second quarter of 2011.
  • Generated revenues of $54.8 million for the quarter ended June 30, 2012, a decrease of $13.3 million or 19% compared to $68.0 million in the second quarter of 2011, due to a decrease of 27% in average realized silver prices.
  • Recognized mine operating earnings of $31.1 million compared to $46.8 million in the second quarter of 2011, a decrease of $15.7 million or 34%, due to lower revenues and higher depreciation, depletion and amortization expense.

IN SUMMARY

First Majestic has experienced another solid financial quarter primarily due to an increase in total production to 2,102,222 silver equivalent ounces, an increase of 14% compared to 1,843,830 silver equivalent ounces produced in the second quarter of 2011. Silver production remained strong during the second quarter with 1,917,248 ounces of silver being produced, representing an increase of 8% compared to 1,780,379 ounces of silver produced in the second quarter of 2011.

Total ore processed in the quarter reached 615,799 tonnes, an increase of 28% compared to the second quarter of 2011. The increase in milled ore is a direct result of the successful plant expansion at La Parrilla which processed a total of 169,786 tonnes in the second quarter compared to 77,363 tonnes in same quarter of 2011. The average silver grade at La Parrilla decreased to 166 g/t in the quarter due to a larger portion of oxide ore being processed from the Quebradillas open pit compared to previous quarters. The Quebradillas open pit is becoming much larger than originally anticipated.

The La Guitarra Silver Mine acquired in July consists of two underground operation centers and a flotation mill with a capacity of 350 tpd, producing approximately 800,000 ounces of silver equivalent per year consisting of approximately 640,000 ounces of silver and 160,000 ounces of silver equivalent from gold. The Company plans to maintain production levels at 350 tpd for the remainder of 2012. A development program is being defined to prepare the mine for a first ramp up stage in which, by the first quarter of 2013, throughput is planned to reach 500 tpd through the flotation circuit. Since the completion of the acquisition, the concentrates being produced at La Guitarra are being shipped to the La Parrilla mill for further leaching in the cyanidation process, where the La Parrilla processing plant is converting this production into doré bars to reduce smelting and refining costs and to improve La Guitarra's economics.

Construction of the new milling facility at Del Toro is well underway and currently on schedule. After the completion of the platform construction at the mill site, foundations were poured at the crushing, flotation and thickener areas in the second quarter. In addition, mechanical installation also began at the crushing, flotation and thickener areas. The Company has plans to invest an estimated $58.5 million in construction of the phase one flotation circuit, equipment and underground development of which $23.8 million has been spent during the first half of 2012. Furthermore, an update to the NI 43-101 Technical Report will soon be released to take account for improved metallurgical results and additional drilling and development activity at Del Toro in preparation for production.

First Majestic is a producing silver company focused on silver production in México and is aggressively pursuing its business plan of becoming a senior silver producer through the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its aggressive corporate growth objectives.

FOR FURTHER INFORMATION visit our website at www.firstmajestic.com.

FIRST MAJESTIC SILVER CORP.

Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release includes certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "schedule" and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses, permits and approvals from government authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company's title to properties; and the factors identified under the caption "Risk Factors" in the Company's Annual Information Form, under the caption "Risks Relating to First Majestic's Business".

Investors are cautioned against attributing undue certainty to forward-looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

February 22, 2024
First Majestic Announces Financial Results for Q4 2023, FY2023, Quarterly Dividend Payment and Deferral of Silver Sales
February 7, 2024
First Majestic Reports Positive Exploration Results at San Dimas, Santa Elena and Jerritt Canyon Properties
January 16, 2024
First Majestic Produces 6.6 Million AgEq Oz in Q4 2023 and 26.9 Million AgEq Oz in 2023; Announces 2024 Production and Cost Guidance and Announces Conference Call Details.
November 2, 2023
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2023
First Majestic Produces 6.3 Million AgEq Oz in Q3 2023 Consisting of 2.5 Million Silver Ounces and 46,720 Gold Ounces
September 14, 2023
First Majestic Announces the Opening of a Minting Facility
August 14, 2023
First Majestic Announces Closing Sale of La Parrilla
August 3, 2023
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2023
First Majestic Produces 6.3 million AgEq Oz in Q2 2023 Consisting of 2.6 million Silver Ounces and 45,022 Gold Ounces; Announces Updated 2023 Guidance and Management Update
July 18, 2023
First Majestic Reports High-Grade Exploration Results at San Dimas, Santa Elena and Jerritt Canyon
May 26, 2023
First Majestic Announces Voting Results from Annual General Meeting
May 22, 2023
CORRECTION FROM SOURCE: First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 22, 2023
First Majestic Reminds Shareholders to Vote in Upcoming Annual General Meeting
May 4, 2023
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 20, 2023
First Majestic Produces 7.6 million AgEq Oz in Q1 Consisting of 2.5 million Silver Ounces and 60,594 Gold Ounces; Announces VP Management Changes
March 31, 2023
First Majestic Announces 2022 Mineral Reserve and Mineral Resource Estimates
March 30, 2023
First Majestic Announces Closing Sale of La Guitarra to Sierra Madre
March 20, 2023
First Majestic Temporarily Suspends Mining Activities at Jerritt Canyon
March 20, 2023
First Majestic Renews Share Repurchase Program
February 23, 2023
First Majestic Announces Financial Results for Q4 2022, FY2022 & Quarterly Dividend Payment
January 19, 2023
First Majestic Produces 7.6M AgEq Oz in Q4 2022 and a Record 31.3M AgEq Oz in 2022; Annual Retail Silver Bullion Sales Increase 27% to New Record; Announces 2023 Production and Cost Guidance and Conference Call Details
December 21, 2022
First Majestic Announces Closing Sale of Royalty Portfolio to Metalla
December 7, 2022
First Majestic Announces Proposed Sale of The La Parrilla Silver Mine for Up To US$33.5 Million
November 28, 2022
First Majestic Announces the Proposed Sale of Its Royalty Portfolio for US$20.0 Million
November 9, 2022
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
November 1, 2022
First Majestic Reports Continued Exploration Success Intersecting 19.97 g/t Au over 20.9m Near Active Underground Mining at Jerritt Canyon
October 18, 2022
First Majestic Produces a New Record of 8.8 Million AgEq Ounces in the Third Quarter Consisting of 2.7 Million Silver Ounces and 67,072 Gold Ounces
August 23, 2022
First Majestic Intersects 19.35 g/t Au over 23.2m in Potential New High-Grade Gold Zone at Jerritt Canyon; Follow-up Drilling Confirms Presence of High-Grade Gold Pod near Active Underground Mining in Smith Mine
August 8, 2022
First Majestic Releases 2021 Sustainability Report
August 4, 2022
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 20, 2022
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
July 20, 2022
First Majestic Produces 7.7M Silver Eqv. Oz in the Second Quarter Consisting of 2.8M Oz Silver and 59,391 Oz Gold; Announces Updated 2022 Guidance and Conference Call Details
May 31, 2022
First Majestic Intersects 8.39 g/t Au over 29.7m near Active Underground Mining at Jerritt Canyon
May 27, 2022
First Majestic Announces Voting Results from Annual General & Special Meeting
May 25, 2022
First Majestic Announces Proposed Sale of the La Guitarra Silver Mine
May 12, 2022
First Majestic Reports First Quarter Financial Results and Quarterly Dividend Payment
April 18, 2022
First Majestic Produces 7.2M Silver Eqv. Oz in the First Quarter Consisting of 2.6M Oz Silver and 58,892 Oz Gold
March 31, 2022
First Majestic Announces 2021 Mineral Reserve and Resource Estimates
March 17, 2022
First Majestic Renews Share Repurchase Program
March 10, 2022
First Majestic Announces Financial Results for Q4 2021, FY2021 & Quarterly Dividend Payment; Appoints New CFO
January 18, 2022
First Majestic Produces New Quarterly Record of 8.6M Silver Eqv. Oz in Q4 2021 and Achieves FY2021 Guidance with New Annual Production Record of 26.9M Silver Eqv. Oz; Announces 2022 Guidance and Today's Conference Call Details; Appoints Interim CFO
December 2, 2021
First Majestic Completes US$230 Million Convertible Senior Notes Offering
November 30, 2021
First Majestic Prices Offering of Convertible Senior Notes
November 29, 2021
First Majestic Launches Offering of Convertible Senior Notes
November 24, 2021
First Majestic Files Updated Technical Report for the Santa Elena Silver/Gold Mine in Sonora, Mexico Including a Positive Pre-Feasibility Study for the Ermitaño Project; Appoints Vice-President of Exploration
November 4, 2021
First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment
October 12, 2021
First Majestic Produces a Record 7.3m Silver Eqv. Oz in the Third Quarter Consisting of 3.3m Oz Silver and 54,525 Oz Gold; Suspended Silver Sales and Held 1.4m Oz of Silver in Inventory at Quarter End
August 16, 2021
First Majestic Reports Second Quarter Financial Results and Quarterly Dividend Payment
July 13, 2021
First Majestic Produces 3.3M Oz Silver and 46,545 Oz Gold (6.4M Silver Eqv. Oz) in the Second Quarter of 2021 - Announces Updated 2021 Guidance, New Board Appointment and Conference Call Details
May 28, 2021
First Majestic Announces Voting Results from Annual General Meeting and Management Update
May 6, 2021
First Majestic Reports First Quarter Financial Results, Inaugural Dividend Payment, and Appointment of VP Operations
April 30, 2021
First Majestic Completes Acquisition of Jerritt Canyon Mine in Nevada, USA and Private Placement with Eric Sprott
April 14, 2021
First Majestic Produces 2.9M Oz Silver and 23,873 Oz Gold (4.5M Silver Eqv. Oz) in the First Quarter of 2021
March 31, 2021
First Majestic Files Updated Technical Reports, 2020 Mineral Reserve and Mineral Resource Estimates & Appoints New Director
March 30, 2021
First Majestic Updates ESG Sustainability Activities Aimed at Helping Local Communities and Improving the Environment
March 18, 2021
First Majestic Renews Share Repurchase Program
March 12, 2021
First Majestic Announces Acquisition of Jerritt Canyon Mine in Nevada, USA
March 10, 2021
First Majestic Responds to Inaccurate Media Reports and Provides Update on Tax Dispute with the Government of Mexico
March 5, 2021
First Majestic Awarded as Socially Responsible Business in Mexico
March 2, 2021
First Majestic Initiates International Arbitration Request under NAFTA against the Government of Mexico
February 18, 2021
First Majestic Announces Financial Results for Q4 2020, FY2020 and Appointment of New Director
January 28, 2021
First Majestic Responds to Market Activity
January 20, 2021
First Majestic Produces 5.5M Silver Eqv. Oz in Q4 2020 (3.5M Silver Oz and 26K Gold Oz); Provides 2021 Outlook and Conference Call Details
December 7, 2020
First Majestic Announces Inaugural Dividend Policy
November 12, 2020
First Majestic to Appeal Circuit Court Decision to Nullify APA
November 5, 2020
First Majestic Reports Third Quarter Financial Results – Generates Record Revenues, Cash Flows and Earnings
October 13, 2020
First Majestic Produces 3.2M Oz Silver and 25,771 Oz Gold (5.2M Silver Eqv. Oz) in the Third Quarter
September 25, 2020
First Majestic Provides SAT Tax Dispute Update
September 21, 2020
First Majestic Announces Filing of Early Warning Report for Acquisition of Shares of Silver Dollar Resources Inc.
September 17, 2020
First Majestic Announces Closing of CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 10, 2020
First Majestic Announces CDN$78 Million Bought Deal Investment by Billionaire Eric Sprott
September 1, 2020
First Majestic Publishes ESG and Sustainability Report
August 6, 2020
First Majestic Reports Second Quarter Financial Results
July 15, 2020
First Majestic Produces 3.5 Million Silver Equivalent Ounces from Partial Operations in Second Quarter; Updates 2020 Guidance & Announces Conference Call Details
July 2, 2020
First Majestic Completes Acquisition of Springpole Silver Stream
June 11, 2020
First Majestic Acquires Silver Stream on First Mining’s Springpole Project
June 10, 2020
First Majestic Announces Voting Results from Annual General Meeting and Appointment of New Director
May 14, 2020
First Majestic Reports First Quarter Financial Results; Temporarily Postpones the Sale of Silver and Gold Due to COVID-19; Announces Operational Restart Procedures
May 13, 2020
First Majestic Initiates NAFTA Arbitration Process Against Mexico for Violating International Law
April 14, 2020
First Majestic Produces 6.2 Million Silver Equivalent Ounces in First Quarter
April 3, 2020
First Majestic Provides Update on Operations in Response to COVID-19
March 30, 2020
First Majestic Updates 2019 Mineral Reserve and Resource Estimates
March 27, 2020
First Majestic Acquires Shares in GR Silver - Early Warning
March 18, 2020
First Majestic Renews Share Repurchase Program
February 24, 2020
First Majestic Announces High-Grade Drill Results from its 2019 Exploration Program at the Ermitaño project within the Santa Elena land package
February 19, 2020
First Majestic Announces Financial Results for Q4 and Year End 2019
February 3, 2020
First Majestic Announces New Chief Operating Officer
January 21, 2020
First Majestic Announces 2020 Production and Cost Guidance
January 15, 2020
First Majestic Produces 6.2M Ounces in Q4 and Record 25.6M Ounces in 2019; Announces New Director & Conference Call Details
November 7, 2019
First Majestic Reports Third Quarter Financial Results
October 15, 2019
First Majestic Produces 6.6 Million Silver Equivalent Ounces in Third Quarter
August 7, 2019
First Majestic Reports Second Quarter Financial Results and Updates 2019 Production and Cost Guidance
July 15, 2019
First Majestic Produces 6.4 Million Silver Equivalent Ounces in Second Quarter; Provides Conference Call Details
May 24, 2019
First Majestic Announces Voting Results from Annual General Meeting and Management Changes
May 9, 2019
First Majestic Reports First Quarter Financial Results
May 1, 2019
First Majestic First Quarter Financial Results to be Released on May 9
April 16, 2019
First Majestic Produces 6.3 Million Silver Equivalent Ounces in First Quarter
March 29, 2019
First Majestic Updates 2018 Mineral Reserve and Resource Estimates
March 19, 2019
First Majestic Renews Share Repurchase Program
February 25, 2019
First Majestic Announces High-Grade Drill Results from 2018 Exploration Program at the Ermitaño Silver/Gold Project; Permitting Status Update
February 25, 2019
First Majestic Announces Financial Results for Q4 and Year End 2018
January 14, 2019
First Majestic Produces a Record 22.2M Silver Eqv. Oz in 2018; Announces Higher 2019 Production Outlook & Conference Call Details
December 27, 2018
First Majestic Silver Corp. Announces At-The-Market Offering Equity Program
November 7, 2018
First Majestic Reports Third Quarter Financial Results
November 6, 2018
First Majestic Announces Updated Release Date for Third Quarter Financial Results
October 15, 2018
First Majestic Files Preliminary Base Shelf Prospectus
October 15, 2018
First Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter
September 10, 2018
First Majestic and Evrim Resources Agree to Exercise of Ermitaño and Cumobabi Option Agreements
August 13, 2018
First Majestic Reports Second Quarter Financial Results
July 16, 2018
First Majestic Produces a Record 5.1M Silver Equivalent Ounces in Second Quarter; Increases 2018 Production Guidance to 20.5M - 22.6M Silver Equivalent Ounces
May 25, 2018
First Majestic Announces Voting Results from Annual General Meeting
May 10, 2018
First Majestic Announces New Stream Agreement at San Dimas Mine and New Credit Facility
May 10, 2018
First Majestic Completes Acquisition of Primero
May 9, 2018
First Majestic Announces Amendments to Advance Notice Policy
May 9, 2018
First Majestic Reports First Quarter Financial Results
May 9, 2018
Primero Announces Receipt of Mexican Antitrust Clearance for Arrangement With First Majestic and Files First Quarter Financial Statements on SEDAR
April 19, 2018
First Majestic Produces 3.9M Silver Eqv. Oz in First Quarter
March 29, 2018
First Majestic Updates Mineral Reserve and Resource Estimates for 2017 and Files Form 40-F Annual Report
March 19, 2018
First Majestic Renews Share Repurchase Program
March 13, 2018
Primero Announces Shareholders Vote In Favour Of Transaction With First Majestic
February 28, 2018
First Majestic Announces Financial Results for Q4 and Year End 2017
February 15, 2018
First Majestic announces Exercise and Closing of Over-Allotment Option
January 29, 2018
First Majestic Completes US$150 Million Convertible Senior Notes Offering
January 25, 2018
First Majestic Prices Offering of Convertible Senior Notes
January 24, 2018
First Majestic Launches Offering of Convertible Senior Notes
January 16, 2018
First Majestic Produces 16.2M Silver Eqv. Oz in 2017 (4.1M Silver Eqv. Oz in Q4); Announces 2018 Production Outlook and Cost Guidance
January 12, 2018
First Majestic Silver Announces Friendly Acquisition of Primero Mining and Restructured Stream with Wheaton Precious Metals
January 9, 2018
First Majestic Provides Review of 2017 Exploration Program and Plans for 2018
December 20, 2017
First Majestic files updated NI 43-101 technical reports on its Del Toro, La Parrilla and San Martin Silver Mines
November 2, 2017
First Majestic Reports Third Quarter Financial Results
October 17, 2017
First Majestic Produces 4.0M Silver Eqv. Oz in Third Quarter
October 3, 2017
First Majestic Reports Accident at La Encantada
August 3, 2017
First Majestic Reports Second Quarter Financial Results
July 11, 2017
First Majestic Produces 3.9M Silver Eqv. Oz in Second Quarter
June 2, 2017
First Majestic to Resume Operations at La Encantada
May 26, 2017
First Majestic Announces Voting Results from Annual General Meeting
May 24, 2017
First Majestic Announce illegal Blockade at La Encantada
May 4, 2017
First Majestic Reports First Quarter Financial Results
April 20, 2017
First Majestic Produces 4.3M Silver Eqv. Oz in First Quarter
March 31, 2017
First Majestic Updates Mineral Reserve and Resource Estimates for YE2016 and Files Form 40-F Annual Report
March 16, 2017
First Majestic Renews Share Repurchase Program
February 28, 2017
First Majestic Appoints New COO and New Member to Board of Directors
February 22, 2017
First Majestic Announces Financial Results for Q4 and Year End 2016
January 17, 2017
First Majestic Produces a Record 18.7M Silver Eqv. Oz in 2016 (4.4M Silver Eqv. Oz in Q4); Announces 2017 Production Outlook and Cost Guidance
November 9, 2016
First Majestic Reports Third Quarter Financial Results
October 27, 2016
Third Quarter Financial Results to be Released on November 9
October 13, 2016
First Majestic Achieves New Record in Silver Production; Produces 4.5 Million Silver Eqv. Ounces in Third Quarter
September 15, 2016
First Majestic Announces Resignation of Ramon Davila From Board of Directors
August 10, 2016
First Majestic Reports Second Quarter Financial Results
July 25, 2016
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 10
July 12, 2016
First Majestic Produces 4.7 Million Silver Eqv. Ounces in Second Quarter
May 27, 2016
First Majestic Announces Election of Directors
May 16, 2016
First Majestic Silver Corp. Changes Annual General Meeting Time
May 12, 2016
First Majestic Silver Corp. Announces Closing of C$50 Million Bought Deal Financing; Over-Allotment Option Fully Exercised
May 10, 2016
First Majestic Reports First Quarter Financial Results
May 5, 2016
First Majestic Revises Date of First Quarter Financial Results to May 10
April 25, 2016
First Majestic Silver Corp.: First Quarter Financial Results to be Released on May 11
April 22, 2016
First Majestic Silver Corp. Announces C$50 Million Bought Deal Financing
April 14, 2016
First Majestic Produces a Record 5.1 Million Silver Eqv. Ounces in First Quarter
March 31, 2016
First Majestic Updates Mineral Reserve and Resource Estimates for Year End 2015 and Files Form 40-F Annual Report
March 28, 2016
First Majestic Silver Corp. Announces Updated La Encantada NI 43-101 Technical Report
March 14, 2016
First Majestic Renews Share Repurchase Program
February 25, 2016
First Majestic Announces Financial Results for Q4 and Year End 2015
February 11, 2016
Fourth Quarter and Year End Financial Results to Be Released on February 25, 2016
February 11, 2016
First Majestic Secures $60 Million Credit Facility
January 19, 2016
First Majestic Produces 16.1M Silver Eqv. Oz in 2015 (4.8M Silver Eqv. Oz in Q4); Announces 2016 Production Outlook and Cost Guidance
November 16, 2015
First Majestic Reports Third Quarter Financial Results
October 14, 2015
First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3'15
October 1, 2015
First Majestic Completes Acquisition of SilverCrest
September 25, 2015
First Majestic and Silvercrest Announce Shareholder Approval of Plan of Arrangement
September 15, 2015
Leading Independent Advisory Firms ISS and Glass Lewis Recommend that SilverCrest and First Majestic Shareholders Vote FOR the Plan of Arrangement
August 27, 2015
First Majestic and SilverCrest Announce Receipt of Interim Order and Mailing of Meeting Materials
August 11, 2015
First Majestic Reports Second Quarter Financial Results and La Encantada Operational Update
July 30, 2015
First Majestic Silver: Second Quarter Financial Results to Be Released on August 11
July 27, 2015
First Majestic Announces Friendly Acquisition of SilverCrest Mines
July 9, 2015
First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15
May 22, 2015
First Majestic Announces Election of Directors
May 7, 2015
First Majestic Reports First Quarter Financial Results
April 23, 2015
First Quarter Financial Results to be Released on May 7
April 22, 2015
First Majestic Silver Corp. Announces Closing of C$30 Million Bought Deal Financing
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 13, 2015
First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1'15
April 6, 2015
First Majestic Announces Promotion of Martin Palacios to Chief Transformation Officer
April 6, 2015
First Majestic Announces Acquisition of Shares of First Mining Corp.
April 5, 2015
First Majestic Silver Corp. Announces C$30 Million Bought Deal Financing
March 31, 2015
Announces New La Guitarra NI 43-101 Technical Report
March 11, 2015
First Majestic Renews Share Repurchase Program
February 23, 2015
First Majestic Announces Financial Results for Q4 and Year End 2014
February 2, 2015
Fourth Quarter and Year End Financial Results to be Released on February 23, 2015
January 13, 2015
First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance
December 1, 2014
Supreme Court of Canada Dismisses Appeal Application by Hector Davila Santos
November 12, 2014
First Majestic Reports Third Quarter Financial Results
November 6, 2014
Conference Call Scheduled on November 12, 2014
October 31, 2014
Third Quarter Financial Results to be Released on November 12, 2014
October 14, 2014
Produces 3.5 Million Silver Eqv. Ounces in Q3; Postpones the Sale of 934K Silver Ounces of Inventory
August 22, 2014
First Majestic to List on the Mexican Stock Exchange
August 13, 2014
First Majestic Reports Second Quarter Financial Results
July 21, 2014
Second Quarter Financial Results to be Released on August 13, 2014
July 14, 2014
New Record of 3.86 million Silver Eqv. Ounces Produced in Q2; Announces Spin-out of Non-Core Exploration Properties
June 9, 2014
First Majestic Wins Application to Dismiss Appeal
May 29, 2014
First Majestic Announces Election of Directors
May 13, 2014
First Majestic Reports First Quarter Financial Results
May 1, 2014
First Quarter Financial Results to be Released on May 13
April 15, 2014
First Majestic Announces US$30M Forward Sale Contract on Lead Production
April 8, 2014
First Majestic's Q1 Production Reaches New Record of 3.63 million Silver Equivalent Ounces
April 4, 2014
First Majestic Appoints VP of Technical Services
March 27, 2014
First Majestic Updates Reserves and Resource Estimates and Files Form 40-F Annual Report
March 10, 2014
First Majestic Announces Extension of Share Repurchase Program
March 3, 2014
First Majestic Announces Changes to Operations and Geological Teams
February 26, 2014
First Majestic Announces Financial Results for Q4 and Year End 2013
February 3, 2014
Fourth Quarter and Year End Financial Results to be Released on February 26, 2014
January 14, 2014
First Majestic becomes a Senior Silver Producer; Produces 10.64M Ounces of Silver in 2013; Projects 12.70M to 13.35M Ounces of Silver in 2014
December 23, 2013
First Majestic Announces Retirement of Robert Young from Board of Directors
December 4, 2013
Silver Doré Production Commences at the Del Toro Silver Mine
November 12, 2013
First Majestic Reports Third Quarter Financial Results
October 30, 2013
Third Quarter Financial Results to be Released on November 12th
October 24, 2013
Appeal Against First Majestic Dismissed
October 16, 2013
First Majestic Produces a New Record of 3.37 million Silver Equivalent Ounces
September 30, 2013
First Majestic Applies to Dismiss Appeal of Positive Judgment for US$93.84 million
August 13, 2013
First Majestic Reports Second Quarter Financial Results
July 15, 2013
Second Quarter Financial Results to be Released on August 13th
July 10, 2013
First Majestic Produces a New Quarterly Record of 3.27 Million Silver Eqv. Ounces
July 2, 2013
Payment of CDN$14.85 million Received in Court Litigation
May 28, 2013
Updated San Martin NI 43-101 Technical Report and Economic Assessment
May 24, 2013
First Majestic Announces Election of Directors
May 15, 2013
First Majestic Reports First Quarter Earnings of $26.5 million on Revenues of $67.1 million
May 7, 2013
First Quarter Financial Results to be Released on May 15th
May 2, 2013
First Majestic Announces Completion of La Guitarra's Expansion to 500 tpd
April 26, 2013
First Majestic Receives Positive Judgment for US$89.6 in Court Litigation
April 17, 2013
First Majestic Earns Socially Responsible Business Distinction Award for Fifth Consecutive Year
April 15, 2013
First Majestic Produces Another Quarterly Record 2.73 Million Silver Eqv. Ounces
April 9, 2013
First Majestic Silver: Del Toro Silver Mine Flotation Circuit Deemed Commercial
March 28, 2013
First Majestic Files Form 40-F Annual Report
March 11, 2013
First Majestic Announces Share Repurchase Program
February 26, 2013
First Majestic Announces Financial Results for Q4 and Year End 2012
February 20, 2013
First Majestic Silver to Announce Fourth Quarter and Year End 2012 Financial Results
February 19, 2013
First Majestic Elects Not to Exercise Right to Match Coeur's Offer for Orko
February 14, 2013
First Majestic Considering Superior Offer from Coeur to Acquire Orko Silver
January 25, 2013
First Majestic Silver Corp.: Production Commences at the Del Toro Silver Mine
January 9, 2013
First Majestic Silver Corp.: Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M Silver Ounces) in Q4; Produced a Record 9.1M Silver Eqv. Ounces (8.3M Silver Ounces) in 2012
January 2, 2013
First Majestic Appoints VP of Operations
December 19, 2012
First Majestic Announces US$50M Forward Sale Contract on Base Metals
December 16, 2012
First Majestic Announces Friendly Acquisition of Orko Silver
November 14, 2012
First Majestic Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increase of 4%
November 7, 2012
First Majestic Silver Corp.: Third Quarter Financial Results to Be Released on November 14th
October 10, 2012
First Majestic Produces a Record 2.44 Million Silver Equivalent Ounces in Third Quarter
August 27, 2012
First Majestic Announces Appointment of VP of Exploration
August 21, 2012
First Majestic Silver Corp.: Updated Del Toro NI 43-101 Technical Report & Final Permit Received
August 16, 2012
First Majestic Recognized as a Leader in Corporate Social Responsibility
August 14, 2012
First Majestic Reports Second Quarter Financial Results
August 7, 2012
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 14th
July 17, 2012
First Majestic Produces 2.1 Million Silver Equivalent Ounces in Second Quarter
July 3, 2012
First Majestic Completes Acquisition of Silvermex Resources
June 26, 2012
Silvermex Securityholders Approve Plan of Arrangement With First Majestic
May 22, 2012
First Majestic Silver Corp.: Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
May 10, 2012
First Majestic Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compared With Q1 2011; Revenues Top $57.8M, Up 5% From Q1 2011
April 16, 2012
First Majestic Silver Corp.: First Quarter Production Results and Full Commencement of Commercial Production at La Parrilla
April 3, 2012
First Majestic Announces Friendly Acquisition of Silvermex Resources
March 30, 2012
First Majestic Files Form 40-F Annual Report
March 5, 2012
First Majestic Announces New Record Earnings & Cash Flows for 2011
February 24, 2012
First Majestic Silver to Announce Fourth Quarter and Year End 2011 Financial Results
January 24, 2012
First Majestic Silver Corp.-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro Construction Update
January 12, 2012
First Majestic Silver Corp. Achieved Record Production of 1.96M Silver Ounces (2.1M Silver Eqv. Ounces) in Q4; Produced a Record 7.6M Silver Eqv. Ounces in 2011
January 4, 2012
First Majestic Appoints Chief Information Officer
December 30, 2011
First Majestic Names Douglas Penrose as Chairman
November 9, 2011
First Majestic Silver Corp.: Earnings Hit $27.8 Million in Third Quarter
October 26, 2011
First Majestic Silver Corp.: Third Quarter Financial Results to be Released on November 9th
October 12, 2011
First Majestic Announces Q3 Production Results and Commences Commercial Production at La Parrilla
October 7, 2011
First Majestic Silver Corp.: Third Quarter Production Results to Be Released on October 12, 2011-Conference Call Scheduled
September 20, 2011
First Majestic Silver Corp.: First Stage of Expansion at the La Parrilla Processing Plant Completed
September 13, 2011
First Majestic Silver Corp.: Mill Capacity at La Parrilla to Reach 2,000 tpd Following Positive NI 43-101 Pre-Feasibility Study
August 11, 2011
First Majestic Silver Corp.: Record Earnings of $30.6 million in Second Quarter
August 3, 2011
First Majestic Silver Corp.: Second Quarter Financial Results to be Released on August 11th
July 7, 2011
First Majestic Silver Corp.: Another Record Quarter of Silver Production
May 16, 2011
First Majestic Earns a Record $23.9 Million in First Quarter of 2011
April 7, 2011
First Majestic Silver Corp.: Silver Production Up 25%; Reaches 97% Pure Silver and Maintains Status as "Purest Silver Company in the World"
March 31, 2011
First Majestic Files Form 40-F Annual Report
March 31, 2011
First Majestic Silver Corp.: Update on the Del Toro Silver Mine
February 28, 2011
First Majestic Silver Corp.: 2010 Audited Financial Results Show Record Earnings & Cash Flows; A Breakout Year for First Majestic
January 11, 2011
First Majestic Silver Corp.: Production Up 72% to 6.53 Million oz Ag in 2010; Exceeds Guidance by 9%
December 13, 2010
First Majestic to List on the New York Stock Exchange
December 6, 2010
First Majestic Silver Corp.: La Parrilla Expansion to 1,600 Tonnes Per Day
November 10, 2010
First Majestic Acquires Surface Rights, Royalties and Infrastructure at Real De Catorce Silver Project
November 9, 2010
First Majestic Silver Corp.: Another Record Quarter of Earnings and Cash Flows
October 6, 2010
First Majestic Silver Corp.: Another New Record for Silver Production; 1,823,370 oz Silver Produced in Q3
August 16, 2010
First Majestic Silver Corp.: Record Earnings and Cash Flows. Purest Silver Producer With 93% of Revenue From Silver Production
July 8, 2010
First Majestic Silver Corp.: New Record for Silver Production; Produces 1,538,798 oz Silver
May 13, 2010
First Majestic Silver Corp.: First Quarter Marks 5th Consecutive Quarter of Net Income
April 22, 2010
First Majestic Silver Corp.: 2nd Year Running for Mexican Distinction as a "Socially Responsible Business"
April 13, 2010
First Majestic Silver Corp.: Conference Call to discuss First Quarter Silver Production and Year End Financial Results
April 12, 2010
First Majestic Silver Corp.: Production Increases by 30% to 1,619,403 Equivalent Ounces Silver
April 8, 2010
First Majestic Silver Corp.: La Encantada Achieves Commercial Production
March 24, 2010
First Majestic Silver Corp.: Conference Call to Discuss First Quarter Silver Production and Year End Financial Results
March 22, 2010
First Majestic Silver Corp.: Year End & Fourth Quarter Financial Results
January 11, 2010
First Majestic Silver Corp.: Production Increases by 18%, Reaches New Record
November 26, 2009
First Majestic Silver Corp.: La Encantada Opening Ceremony & Production of First Silver Precipitates
November 13, 2009
First Majestic Completes Acquisition of Normabec Mining Resources; Normabec Spins Out Brionor Resources Inc.
November 12, 2009
First Majestic Silver Corp.: Record Third Quarter Financial Results
November 6, 2009
Normabec Shareholders Approve Plan Of Arrangement With First Majestic
October 13, 2009
First Majestic Silver Corp.: La Encantada Expansion Nearing Completion
October 6, 2009
First Majestic Silver Corp.: Third Quarter Production Results
September 18, 2009
First Majestic Silver Corp.: Settlement of Current Liabilities Closes
September 16, 2009
First Majestic Silver Corp.: Second Tranche of Non-Brokered Private Placement Closes
September 14, 2009
First Majestic to Acquire Normabec Mining Resources
August 20, 2009
First Majestic Silver Corp.: First Tranche of Non-Brokered Private Placement Closes
August 13, 2009
First Majestic Silver Joins OTCQX
August 12, 2009
First Majestic Silver Corp.: Non-Brokered Private Placement and Debt Settlement
July 20, 2009
Second Quarter Production Results
July 16, 2009
Update of Litigation
May 14, 2009
First Majestic Silver Corp.: First Quarter Financial Results
April 27, 2009
First Majestic Silver Corp.: Silver Production Increases 4% in 1st Quarter
March 31, 2009
2008 Year End Financial Results
March 23, 2009
First Majestic Receives Mexican Distinction as a "Socially Responsible Business"
March 17, 2009
First Majestic Silver Corp.: La Parrilla Receives "Clean Industry Certification"
March 5, 2009
First Majestic Silver Corp.: Closing of $21.2 Million Offering
February 26, 2009
First Majestic Silver Corp.: Resource Disclosure Clarification
February 19, 2009
First Majestic Announces Pricing of Offering
February 18, 2009
First Majestic Announces C$25 Million Offering
February 17, 2009
First Majestic Silver Corp.: La Parrilla Silver Mine Updates NI 43-101 Resource
January 20, 2009
First Majestic Silver Corp.: San Martin Updated NI 43-101 Report Increasing Reserves/Resources by 45.81%
January 13, 2009
First Majestic Silver Corp.: Production Increases 27% in 4th Quarter
December 23, 2008
First Majestic Silver Corp.: La Encantada Updated NI 43-101 Report Increasing Reserves By 183%
November 19, 2008
First Majestic Silver Corp.: Operations Update
November 14, 2008
First Majestic Silver Corp.: Third Quarter Financial Results
October 28, 2008
First Majestic Silver Corp.: Another Major Intersection at Del Toro Silver Mine, Drill Hole Cuts 62.05 Metres (203.58 ft) of 422 g/t Ag, 6.29% Pb, 6.78% Zn & 0.74 g/t Au
October 23, 2008
First Majestic Silver Corp.: 3rd Quarter Production Results
October 10, 2008
First Majestic Silver Corp.: Del Toro Silver Mine NI 43-101 Resources of 57 Million Ag eqv. Ounces
September 11, 2008
First Majestic Silver Corp.: Many Positive Developments Underway
August 15, 2008
First Majestic Silver Corp.: Second Quarter Financial Results
July 17, 2008
First Majestic Silver Corp.: Major Intersection at San Juan Silver Mine; Drill Hole Intersects 74.20 Metres (243 ft) of 359 g/t Ag, 7.07% Pb & 7.60% Zn
July 15, 2008
First Majestic Silver Corp.: 2nd Quarter Production Shows Continued Ramp-Up
June 10, 2008
First Majestic Silver Corp.: Major Expansion Launched at La Encantada Silver Mine
May 16, 2008
First Majestic Silver Corp.: Record First Quarter Financial Results
April 29, 2008
First Majestic Silver Corp.: 1st Quarter Production Results
April 22, 2008
First Majestic Silver Corp.: Commissioning of Flotation Circuit at the San Martin Silver Mine
April 17, 2008
First Majestic Silver Corp.: 2007 Year End Financial Results
April 4, 2008
First Majestic Silver Corp.: Exercise and Closing of Over-Allotment Option
April 1, 2008
First Majestic Silver Corp.: Discovery of New High Grade Ore Shoot on the Vacas Vein at the La Parrilla Silver Mine
March 25, 2008
First Majestic Silver Corp.: Closing of $45,475,000 Offering
March 5, 2008
First Majestic Silver Corp.: Drill Intersects 39.6 Metres of 199 g/t Ag, 3.92% Pb & 4.02% Zn at San Juan Silver Mine
January 30, 2008
La Parrilla Silver Mine Update and New NI 43-101 Resource
January 17, 2008
Another Record Quarter of Silver Production
January 14, 2008
Toronto Stock Exchange Listing
December 13, 2007
TSX Conditional Approval
December 3, 2007
Update on the Chalchihuites Group of Properties
November 29, 2007
Highlights from 3rd Quarter Financial Statements
November 13, 2007
Update on the Cuitaboca Silver Project
October 23, 2007
Another Record Quarter of Silver Production
August 30, 2007
Highlights from 2nd Quarter Financial Statements
July 26, 2007
Second Quarter Silver Production Increases
July 4, 2007
La Parrilla Silver Mine Update and New NI 43-101 Resource
June 18, 2007
La Encantada Silver Mine Update and new NI 43-101 Resource
May 31, 2007
Highlights from 1st Quarter Financial Statements
May 28, 2007
San Martin Silver Mine Update and new NI 43-101 Resource
May 10, 2007
Closing of $34,415,000 Private Placement
April 28, 2007
Silver Production increases by 38%
April 20, 2007
Financing Amended
March 28, 2007
First Majestic Files Preliminary Short Form Prospectus

Subscribe