Los Gatos
silver mine
2025 production (100% basis)
12.7m ageq oz
(8.4m ag oz + 4.5k au oz + 81.0m zn lbs + 46.1m pb lbs + 1.3m cu lbs)
(8.4m ag oz + 4.5k au oz + 81.0m zn lbs + 46.1m pb lbs + 1.3m cu lbs)
2025 all-in sustaining costs
$15.15 per ageq oz
proven & probable reserves
35.3m ag oz + 60k au oz + 685.9m zn lbs + 371.4m pb lbs + 39.1m cu lbs
measured & indicated
42.4m ag oz + 70k au oz + 842.6m zn lbs + 450.2m pb lbs + 44.0m cu lbs
inferred
10.7m ag oz + 20k au oz + 347.3m zn lbs + 159.2m pb lbs + 18.8m cu lbs
Santa Elena
silver/gold mine
2025 production
9.1m ageq oz
(1.4m ag oz + 88k au oz)
(1.4m ag oz + 88k au oz)
2025 all-in sustaining costs
$17.96 per ageq oz
proven & probable reserves
11.1m ag oz + 250k au oz
measured & indicated
21.1m ag oz + 510k au oz
inferred
41.9m ag oz + 970k au oz
Springpole Project
gold & silver project
location
110 km northwest of the town of red lake, ontario, canada
area
70,000 hectares
metals
stream on 50% of payable silver
San Dimas
silver/gold mine
2025 production
10.2m ageq oz
(5.4m ag oz + 56k au oz)
(5.4m ag oz + 56k au oz)
2025 all-in sustaining costs
$19.62 per ageq oz
proven & probable reserves
23.2m ag oz + 290k au oz
measured & indicated
45.4m ag oz + 560k au oz
inferred
43.8m ag oz + 490k au oz

